What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; Site Safety / Safeguarding; Other Building / Code Compliance. The hearing date is October 15, 2026; the source issue date(s) are August 7, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39557667J
CLASS - 1 · Issued August 7, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: NOTE: AT THE TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE, I OBSERVED CONSTRUCTION DUST AND SAWDUST MIGRATING FROM THE JOB SITE INTO THE PUBLIC RIGHT-OF-WAY CONTRARY TO 3306.9.3. THIS CONDITION CREATES A H
Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Other Building / Code Compliance — Summons 39557668L
CLASS - 2 · Issued August 7, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: NOTE: AT THE TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE, I OBSERVED WORK BEING PERFORMED AT EXPOSURE #4 AT A HEIGHT EXCEEDING 48 INCHES ABOVE THE ROOF OF THE ADJOINING BUILDING WITHOUT THE REQUIRED ROOF
Cited provision(s): 2P4
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Work Without a Permit — Summons 39557666H
CLASS - 1 · Issued August 7, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: NOTE: AT TIME OF INSPECTION OF AN ACTIVE SITE, I OBSERVED ONGOING CONSTRUCTION OPERATIONS, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS FOUND THAT THE NEW BUILDING GENERAL CONSTRUCTION PERMIT WAS NOT ISSUED FOR
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39557669N
CLASS - 2 · Issued August 7, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: NOTE: AT THE TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE, I OBSERVED A METAL BOX ATTACHED TO THE STRUCTURE. A REVIEW OF THE APPROVED SITE SAFETY PLAN DETERMINED THAT THIS INSTALLATION WAS NOT IDENTIFIED O
Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review