What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Other Building / Code Compliance. The hearing date is October 15, 2026; the source issue date(s) are August 5, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Electrical Work / Electrical Permit — Summons 39199321P
CLASS - 2 · Issued August 5, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE/MAINTAIN SUFFICIENT ACCESS/WORK SPACE ABOUT ELECTRICAL EQUIPMENT. OBSERVED IN THE BASEMENT THE MAIN ELECTRICAL SERVICE EQUIPMENT IS BLOCKED BY TRASH BINS AND THE MAIN SERVICE SW IS BLOCKED BY
Cited provision(s): 2D3 — EC 110.26 FAILURE TO PROVIDE/MAINTAIN ACCESS/WORK SPACE ABOUT ELEC. EQUIP
How this type of condition is typically resolved
Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.
Hearing issues to verify
- Was there an active electrical application/permit covering the cited wiring or equipment?
- Was the condition already corrected or disconnected before the inspection date?
- Does the cited equipment/location match the permitted scope and electrical inspection record?
Evidence that may matter
- Electrical permit/application and inspection records
- Licensed electrician invoice, letter or work order
- Photographs of wiring/equipment before and after correction
- Testing, certification or utility documentation where relevant
Other Building / Code Compliance — Summons 39199322R
CLASS - 1 · Issued August 5, 2026; hearing October 15, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO INSTALL GROUNDING ELECTRODE CONDUCTOR. OBSERVED IN THE BASEMENT THE MAIN ELECTRICAL SERVICE HAS NO ELECTRODE GROUND ROD NOT INSTALLED. GROUND ROD IS SECOND MEANS OF GROUNDING. ARTICLE 250 GROUNDING 2
Cited provision(s): 1D9 — EC 250.64 FAIL TO INSTALL GROUNDING ELECTRODE CONDUCTOR AS PER SECTION
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.