BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 1083717

Manhattan property record with 9 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughManhattan
BIN1083717
Block / Lot00999 / 0029
October Records9
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556979Y (source ECB number 39556979Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556967R
ACTIVE
October 1, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OBS SIDEWALK SHED INSTALLED IN A NONCONFORMING MANNER. FIELD CONDITIONS DID NOT CONFORM TO THE DOB APPROVED CONSTRUCTION DOCUMENTS. SIDEWALK SHED WAS MISSING REQUIRED BAYS, OPENINGS, TRUSSES, CROSS BRACES, AND 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39556976Z
ACTIVE
October 1, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 OBSERVED SUSPENDED SCAFFOLD IN USE&READILY AVAILABLE FOR USE. THE SPECIAL RIGGER FAILED TO PERFORM A SAFE &PROPER INSPECTION. THE INSTALLATION DID NOT CONFORM TO THE APPROVED CD5 AND INCLUDED MISSING REQUIRED T 149 — BC 3314.4.3.1 (2008 CODE), 27-1045 & BC 3314.4.3 (2014 CODE) FAILURE TO PERFORM SAFE/PROPER INSPECTION OF SUSPENDED SCAFFOLD.
39556979Y
ACTIVE
October 1, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 OBS SUSPENDED SCAFFOLD OPERATIONS. UPON REQUEST, MANUFACTURER SPECIFICATIONS,FOR 12,50-LB MOTORS, PENDENTS,COMPONENTS WERE NOT PROVIDED. COMPLIANCE WITH THE APPROVED CD5 AND CODE COULD NOT BE VERIFIED, CREATING 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
39556968Z
ACTIVE
October 1, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBS SUPP. SCAFFOLD@ ROOF LEVEL INSTALLED &IN USE IN A NONCONFORMING MANNER.APPROVED PLANS INDICATED OUTRIGGERS(BIKE) ON 2 FT.&3 FT.BICYCLE BRACKETS; FIELD CONDITIONS CONSISTED OF 4 FT. 4 IN. PIPE&KNUCKLE INSTAL 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39556977K
ACTIVE
October 1, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 3314.15.2: OBS SUSPENDED SCAFFOLD PLATFORM INSTALLED & AVAILABLE FOR USE WITH STIRRUPS POSITIONED APPROX. 6 TO 7 FT. FROM THE PLATFORM ENDS,&LESS AT SOME LOCATIONS, INSTEAD OF THE REQUIRED 8 TO 10 FT. CONFIGURA 2P7
39556966P
ACTIVE
October 1, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBS SSP DID NOT CONFORM TO THE APPROVED CONSTRUCTION DOCS& AMENDMENTS. ALTHOUGH THE PLAN PERMITTED COMBINED PHASES &REQUIRED PROTECTIONS, IT FAILED TO INDICATE SUSPENDED SCAFFOLD DROPS,ROOF SUPPORTED SCAFFOLD L 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39556969K
ACTIVE
October 1, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED CHAIN-LINK FENCE INSTALLED ALONG THE SITE PERIMETER WITHOUT A VALID DOB PERMIT AUTHORIZING THE INSTALLATION. FENCE WAS ERECTED AND MAINTAINED WITHOUT THE REQUIRED PERMIT, CONSTITUTING UNPERMITTED WORK 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
39556975R
ACTIVE
October 1, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED OUTRIGGER BEAM INSTALLATION IN USE ON PIPE-FRAME SUPPORTS WITH 4 FT. 10 IN. OUTREACH AND A 1,250-LB MOTOR WHERE THE APPROVED CD5 PERMITTED 1,000 LBS. REQUIRED ADDITIONAL TIEBACKS WERE NOT PROVIDED, TIE 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39556978M
ACTIVE
October 1, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED SUSPENDED SCAFFOLD EQUIPMENT INSTALLED AND AVAILABLE FOR USE. NONE OF THE REQUIRED DOCUMENTS WERE PROVIDED FOR THE BEE ACCESS 5X5 OUTRIGGER BEAM ASSEMBLY,OUTRIGGER (16 FT), 1,250-LB HOIST MOTORS, PENDA 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 9 summons records for this property identifier. The charge mix is: 5 Work Without a Permit summonses; 4 Sidewalk Shed / Scaffold summonses. The hearing date is October 1, 2026; the source issue date(s) are July 22, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39556967R

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS SIDEWALK SHED INSTALLED IN A NONCONFORMING MANNER. FIELD CONDITIONS DID NOT CONFORM TO THE DOB APPROVED CONSTRUCTION DOCUMENTS. SIDEWALK SHED WAS MISSING REQUIRED BAYS, OPENINGS, TRUSSES, CROSS BRACES, AND

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39556976Z

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED SUSPENDED SCAFFOLD IN USE&READILY AVAILABLE FOR USE. THE SPECIAL RIGGER FAILED TO PERFORM A SAFE &PROPER INSPECTION. THE INSTALLATION DID NOT CONFORM TO THE APPROVED CD5 AND INCLUDED MISSING REQUIRED T

Cited provision(s): 149 — BC 3314.4.3.1 (2008 CODE), 27-1045 & BC 3314.4.3 (2014 CODE) FAILURE TO PERFORM SAFE/PROPER INSPECTION OF SUSPENDED SCAFFOLD.

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39556979Y

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS SUSPENDED SCAFFOLD OPERATIONS. UPON REQUEST, MANUFACTURER SPECIFICATIONS,FOR 12,50-LB MOTORS, PENDENTS,COMPONENTS WERE NOT PROVIDED. COMPLIANCE WITH THE APPROVED CD5 AND CODE COULD NOT BE VERIFIED, CREATING

Cited provision(s): 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39556968Z

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS SUPP. SCAFFOLD@ ROOF LEVEL INSTALLED &IN USE IN A NONCONFORMING MANNER.APPROVED PLANS INDICATED OUTRIGGERS(BIKE) ON 2 FT.&3 FT.BICYCLE BRACKETS; FIELD CONDITIONS CONSISTED OF 4 FT. 4 IN. PIPE&KNUCKLE INSTAL

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39556977K

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3314.15.2: OBS SUSPENDED SCAFFOLD PLATFORM INSTALLED & AVAILABLE FOR USE WITH STIRRUPS POSITIONED APPROX. 6 TO 7 FT. FROM THE PLATFORM ENDS,&LESS AT SOME LOCATIONS, INSTEAD OF THE REQUIRED 8 TO 10 FT. CONFIGURA

Cited provision(s): 2P7

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39556966P

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBS SSP DID NOT CONFORM TO THE APPROVED CONSTRUCTION DOCS& AMENDMENTS. ALTHOUGH THE PLAN PERMITTED COMBINED PHASES &REQUIRED PROTECTIONS, IT FAILED TO INDICATE SUSPENDED SCAFFOLD DROPS,ROOF SUPPORTED SCAFFOLD L

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39556969K

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED CHAIN-LINK FENCE INSTALLED ALONG THE SITE PERIMETER WITHOUT A VALID DOB PERMIT AUTHORIZING THE INSTALLATION. FENCE WAS ERECTED AND MAINTAINED WITHOUT THE REQUIRED PERMIT, CONSTITUTING UNPERMITTED WORK

Cited provision(s): 2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39556975R

CLASS - 2 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED OUTRIGGER BEAM INSTALLATION IN USE ON PIPE-FRAME SUPPORTS WITH 4 FT. 10 IN. OUTREACH AND A 1,250-LB MOTOR WHERE THE APPROVED CD5 PERMITTED 1,000 LBS. REQUIRED ADDITIONAL TIEBACKS WERE NOT PROVIDED, TIE

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39556978M

CLASS - 1 · Issued July 22, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED SUSPENDED SCAFFOLD EQUIPMENT INSTALLED AND AVAILABLE FOR USE. NONE OF THE REQUIRED DOCUMENTS WERE PROVIDED FOR THE BEE ACCESS 5X5 OUTRIGGER BEAM ASSEMBLY,OUTRIGGER (16 FT), 1,250-LB HOIST MOTORS, PENDA

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 9 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.