October 2026 NYC DOB / OATH Hearing — BIN 1085486

Manhattan property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 1, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Façade / Exterior Wall

BoroughManhattan
BIN1085486
Block / Lot00016 / 0210
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035730073N (source ECB number 35730073N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35730073N
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $25,000.00 FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION, I OBSERVED AT MAIN ROOF, UNSECURED OUTDOOR FURNITURE THAT APPEARS TO HAVE FLEW OFF MAIN ROOF AND CAUSED DAMAGE TO 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
35730074P
ACTIVE
October 1, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT THAT BUILDING OR STRUCTURE HAS BECOME POTENTIALLY COMPROMISED. NOTE: AT THE TIME OF INSPECTION I OBSERVED THAT OUTDOOR FURNITURE AT ROOF LEVEL FLEW OFF MAIN ROOF ONT 1A9 — 28-216.12.6 FAILURE TO IMMEDIATELY NOTIFY DEPARTMENT THAT BUILDING OR STRUCTURE HA

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Façade / Exterior Wall; Other Building / Code Compliance. The hearing date is October 1, 2026; the source issue date(s) are July 20, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Façade / Exterior Wall — Summons 35730073N

CLASS - 1 · Issued July 20, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION, I OBSERVED AT MAIN ROOF, UNSECURED OUTDOOR FURNITURE THAT APPEARS TO HAVE FLEW OFF MAIN ROOF AND CAUSED DAMAGE TO

Cited provision(s): 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Other Building / Code Compliance — Summons 35730074P

CLASS - 1 · Issued July 20, 2026; hearing October 1, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO IMMEDIATELY NOTIFY THE DEPARTMENT THAT BUILDING OR STRUCTURE HAS BECOME POTENTIALLY COMPROMISED. NOTE: AT THE TIME OF INSPECTION I OBSERVED THAT OUTDOOR FURNITURE AT ROOF LEVEL FLEW OFF MAIN ROOF ONT

Cited provision(s): 1A9 — 28-216.12.6 FAILURE TO IMMEDIATELY NOTIFY DEPARTMENT THAT BUILDING OR STRUCTURE HA

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.