Demolition — Summons 39199617Y
DOB allegation in the source extract: ATOI OBSERVED THE DEMOLITION SITE WAS NOT MAINTAINED IN A SAFE AT FOURTH FLOOR AND ORDERLY CONDITION. DEBRIS AND DEMOLITION MATERIALS WERE SCATTERED THROUGHOUT THE WORK AREA, CREATING UNSAFE HOUSEKEEPING CONDIT
Cited provision(s): 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records