What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Work Without a Permit. The hearing date is October 29, 2026; the source issue date(s) are August 20, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39201298X
CLASS - 2 · Issued August 20, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION AT APPROX. 2:30PM IN PH6,7 OBSERVED WHILE ACTIVE CONSTRUCTION WAS BEING PERFORMED UNDER JOB# M01387633-I1-GC, NO APPROVED PLANS ON SITE/PROPERTY ., MAINTAIN/DISPLAY REQUIRED DOCUMENTS
Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Work Without a Permit — Summons 39201299H
CLASS - 1 · Issued August 20, 2026; hearing October 29, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION AT APPROX. 2:30PM IN PH6,7 OBSERVED UNDER ACTIVE CONSTRUCTION, 7+ COILED ELECTRICAL WIRES EXPOSED HANGING FROM SHEET ROCKED CEILING OPENINGS THROUGHOUT PENTHOUSE APT. UNDER JOB# M01387633-
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review