Site Safety / Safeguarding — Summons 39557246L
DOB allegation in the source extract: AT TIME OF INSPECTION, A WORKER WAS OBSERVED ACCESSING THE ROOF TO PERFORM ROOFING WORK WHERE THE ROOF PERIMETER WAS PROTECTED ONLY BY AN APPROXIMATELY 25-INCH PARAPET. NO COMPLIANT GUARDRAILS, CONTROLLED ACCES
Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records