What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: Egress / Exit Obstruction; Failure to Maintain; Electrical Work / Electrical Permit; Work Without a Permit. The hearing dates are October 2, 2026, October 30, 2026; the source issue date(s) are August 15, 2026, July 1, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Egress / Exit Obstruction — Summons 35734167M
CLASS - 1 · Issued July 1, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: MAIN ENTRANCE/EXIT DOOR WAS NOT READILY OPENABLE FROM THE EGRESS SIDE. LEVEL HARDWARE FAILED TO FULLY RETRACT MAKING IT DIFFICULT TO OPEN OR CLOSE CORRECT
Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Failure to Maintain — Summons 35734168Y
CLASS - 1 · Issued July 1, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT ROOF LEVEL, INTERIOR BULKHEAD HAS WATER PENETRATIONS CREATING WATER DAMAGE TO CEILING. AT THE TIME OF INSPECTION, ALSO AT THE MAIN ENTRANCE CRACK
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Electrical Work / Electrical Permit — Summons 39200714L
CLASS - 1 · Issued August 15, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: I OBSERVED UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, OPEN BREAKER PANELS AND MAIN LINE BOX WITHOUT COVERS SUBJECT TO ELECTROCUTION OR POTENTIAL FIRE., COMPLY WITH EC; FIX ALL CONDITIONS AS PER NEC AND NYC AMENDM
Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
How this type of condition is typically resolved
Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.
Hearing issues to verify
- Was there an active electrical application/permit covering the cited wiring or equipment?
- Was the condition already corrected or disconnected before the inspection date?
- Does the cited equipment/location match the permitted scope and electrical inspection record?
Evidence that may matter
- Electrical permit/application and inspection records
- Licensed electrician invoice, letter or work order
- Photographs of wiring/equipment before and after correction
- Testing, certification or utility documentation where relevant
Work Without a Permit — Summons 39200715N
CLASS - 1 · Issued August 15, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: I OBSERVED REPLACEMENT OF LINE SIDE RACEWAY DUE TO ELECTRICAL SHORT AND 200 AMP SERVICE PANEL AND METER ENCLOSURE INSTALLED WITHOUT AND ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PANEL
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.