What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Stop Work Order. The hearing dates are October 2, 2026, October 30, 2026; the source issue date(s) are August 5, 2026, July 28, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Elevator / Vertical Transportation — Summons 39197903X
CLASS - 1 · Issued July 28, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: CEASE USE ITEMS: DOOR ZONE RESTRICTOR AND DOOR LOCK MONITORING INOPERATIVE, CREATING A HAZARDOUS CONDITION PER 1RCNY11-02. REMEDY: RESTORE TO SERVICE IMMEDIATELY AND E-MAIL THE ELEVATOR DIVISION AT EIR@BUILDING
Cited provision(s): 151 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Stop Work Order — Summons 39200832M
CLASS - 1 · Issued August 5, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: AT TIME OF INSPECTION - WORK OBSERVED AGAINST PSWO INCLUDED THE REMOVAL OF PLUMBING LINES & APPRX A 20'L X 3'W X 3'D EXCAVATION. REFERENCE
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.