BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2002941

Bronx property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 2, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Electrical Work / Electrical Permit

BoroughBronx
BIN2002941
Block / Lot02477 / 0029
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198002N (source ECB number 39198002N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198002N
ACTIVE
October 2, 2026
10:30 AM
CLASS - 2 PENDING $800.00 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES. OBSERVED IN THE HALLWAYS / COMMON AREAS THE RECEPTACLES ARE NOT TAMPER RESISTANT FOR RESIDENTIAL OCCUPANCY. ALL RECEPTACLES SHAL 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39197991P
ACTIVE
October 2, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED GALVANIZED PIPE USED ON GAS WHICH IS NOT APPROVED BECAUSE THE ZINC CODING WITH FLAKE AND CAUSE PROBLEMS DOWN THE LINE CONTRARY TO NYC FGC 403 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39198003P
ACTIVE
October 2, 2026
8:30 AM
CLASS - 2 PENDING $2,400.00 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT THE MAIN HOUSE WATER GROUND CLAMP IS INSTALLED INCORRECTLY THE MAIN WATER GROUND CLAMP SHALL BE INSTALLED BEFORE THE MAIN WA 2E2 — EC 250.4 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Failure to Maintain; Other Building / Code Compliance. The hearing date is October 2, 2026; the source issue date(s) are July 28, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39198002N

CLASS - 2 · Issued July 28, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES. OBSERVED IN THE HALLWAYS / COMMON AREAS THE RECEPTACLES ARE NOT TAMPER RESISTANT FOR RESIDENTIAL OCCUPANCY. ALL RECEPTACLES SHAL

Cited provision(s): 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Failure to Maintain — Summons 39197991P

CLASS - 1 · Issued July 28, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED GALVANIZED PIPE USED ON GAS WHICH IS NOT APPROVED BECAUSE THE ZINC CODING WITH FLAKE AND CAUSE PROBLEMS DOWN THE LINE CONTRARY TO NYC FGC 403

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Other Building / Code Compliance — Summons 39198003P

CLASS - 2 · Issued July 28, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE BASEMENT THE MAIN HOUSE WATER GROUND CLAMP IS INSTALLED INCORRECTLY THE MAIN WATER GROUND CLAMP SHALL BE INSTALLED BEFORE THE MAIN WA

Cited provision(s): 2E2 — EC 250.4 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.