What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Elevator / Vertical Transportation; Work Without a Permit. The hearing date is October 30, 2026; the source issue date(s) are August 25, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Elevator / Vertical Transportation — Summons 39201707H
CLASS - 2 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: CLASS 2: CAT 1 TEST - CATEGORY 1 TEST NOT PERFORMED FOR YEAR 2025, FAILING REQUIRED ANNUAL TESTING AND DOCUMENTATION. AS PER ASME A17.1 8.6.1.7. REMEDY: PERFORM CATEGORY 1 TEST AND POST VALID TEST TAG WITH CURR
Cited provision(s): 251 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER:SERVICE EQUIPMEN
How this type of condition is typically resolved
Elevator charges often require licensed-elevator maintenance or repair, the required periodic inspection/test filing, an affirmation of correction where applicable, and reinspection for hazardous conditions.
Hearing issues to verify
- Does the device number/location on the summons match the building's elevator record?
- Was the cited defect repaired or the device removed from service before the inspection?
- Were the required CAT/periodic inspection filings timely and accepted?
Evidence that may matter
- Elevator device record and inspection/test reports
- Maintenance contractor logs and repair tickets
- Affirmation of Correction / reinspection result
- Photographs or controller/service records
Work Without a Permit — Summons 39201681Z
CLASS - 2 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED ON THE ROOF NEW GENERATOR INSTALLED FOR EMERGENCY POWER BACK UP WITH NEW TRANSFER SWITCH IN ATS RM. CHECKED BIS / DOB NOW NO PERMIT ON FILE PERMIT #X00956916 DOES NOT
Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review