Sidewalk Shed / Scaffold — Summons 39201222J
DOB allegation in the source extract: ATOI OBSERVED WORKERS POINTING OF A SUSPENDED SCAFFOLDING AT EXPOSURE #1 AT ABOVE PREMISES. NO NOTICE WAS GIVING TO DEPARTMENT OF BUILDINGS PRIOR TO BEGINNING THE WORK. ISSUED NOV B261, COMPLY WITH CODE
Cited provision(s): 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records