What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Failure to Maintain summonses; Electrical Work / Electrical Permit. The hearing date is October 16, 2026; the source issue date(s) are August 10, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Electrical Work / Electrical Permit — Summons 39200043J
CLASS - 1 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI OBSERVED AT CELLAR AND BASEMENT UNSAFE ELECTRICAL EQUIPMENT AND WIRING IN USE. OPEN ELECTRICAL PANELS AND BOXES WITH EXPOSED LIVE WIRING WERE OBSERVED. THIS CONDITION CREATES A FIRE AND ELECTRICAL SHOCK HA
Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
How this type of condition is typically resolved
Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.
Hearing issues to verify
- Was there an active electrical application/permit covering the cited wiring or equipment?
- Was the condition already corrected or disconnected before the inspection date?
- Does the cited equipment/location match the permitted scope and electrical inspection record?
Evidence that may matter
- Electrical permit/application and inspection records
- Licensed electrician invoice, letter or work order
- Photographs of wiring/equipment before and after correction
- Testing, certification or utility documentation where relevant
Failure to Maintain — Summons 39200044L
CLASS - 1 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI OBSERVED AT CELLAR & BASEMENT PIPING PENETRATING FIRE-RATED WALLS WITHOUT REQUIRED FIRESTOPPING. OPENINGS REMAIN UNPROTECTED, COMPROMISING THE FIRE-RESISTIVE RATING OF THE WALLS. PROVIDE REQUIRED FIRESTOPP
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Failure to Maintain — Summons 39200042H
CLASS - 2 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ATOI AT EXPO #1, #3, AND INNER COURT ,OBSERVED SEVERAL WINDOW-MOUNTED A/C UNITS WITHOUT REQUIRED FALL PROTECTION OR ADEQUATE SECURING. THIS CONDITION CREATES A FALLING-OBJECT HAZARD TO PEDESTRIANS, TENANTS, VIS
Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.
Hearing issues to verify
- Does the description accurately identify the component, location and condition?
- Was the condition already repaired or not present when the summons was issued?
- Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?
Evidence that may matter
- Dated before/after photographs
- Repair invoices and contractor statements
- Professional inspection/report when structural or technical conditions are involved
- Maintenance logs and prior inspection records
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.