October 2026 NYC DOB / OATH Hearing — BIN 2008240

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2008240
Block / Lot02852 / 0030
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039199234R (source ECB number 39199234R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199231L
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROVIDE AN UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT TIME OF INSPECTION - EXIT PASSAGE FROM EXPOSURE 3 FIRE ESCAPE DROP LADDER WAS OBSERVED OBSTRUCTED BY BAGS OF GARBAGE, BIKES, TOYS, ETC., CREATING PO 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
39199234R
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - WATER & WASTE LINES INSTALLED FOR AN ADDL'T 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39199232N
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, OUTLETS, SWITCHES, BRANCH CIRCUITS., OBTAIN PERMIT 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39199235Z
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 CONTRARY TO HPD MDR # 201590 & ICARD WHICH INDICATES 1 CELLAR APT: AT TIME OF INSPECTION - CELLAR WAS OBSERVED CREATED & OCCUPIED WITH 2 CLASS 'A' APTS. TENANT NORTH APT & SUPER SOUTH APT: EACH WITH 3 PC BTHRM; 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39199233P
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE A BTHRM, BDRM, CLOSETS., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39199236K
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 FTM BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION: 1. CONCRETE VESTIBULE BOTTOM STEP & FLOOR OBSERVED CRACKED & SLOPING WITH POTENTIAL TO COLLAPSE; 2. SUPER SOUTH APT OBSERVED WITH OBSTRUCTED 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Egress / Exit Obstruction; Illegal Occupancy / Conversion; Failure to Maintain. The hearing date is October 16, 2026; the source issue date(s) are August 5, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Egress / Exit Obstruction — Summons 39199231L

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE AN UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT TIME OF INSPECTION - EXIT PASSAGE FROM EXPOSURE 3 FIRE ESCAPE DROP LADDER WAS OBSERVED OBSTRUCTED BY BAGS OF GARBAGE, BIKES, TOYS, ETC., CREATING PO

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Work Without a Permit — Summons 39199234R

CLASS - 2 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - WATER & WASTE LINES INSTALLED FOR AN ADDL'T 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39199232N

CLASS - 2 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, OUTLETS, SWITCHES, BRANCH CIRCUITS., OBTAIN PERMIT

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39199235Z

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: CONTRARY TO HPD MDR # 201590 & ICARD WHICH INDICATES 1 CELLAR APT: AT TIME OF INSPECTION - CELLAR WAS OBSERVED CREATED & OCCUPIED WITH 2 CLASS 'A' APTS. TENANT NORTH APT & SUPER SOUTH APT: EACH WITH 3 PC BTHRM;

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39199233P

CLASS - 2 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR SOUTH APT - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE A BTHRM, BDRM, CLOSETS., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39199236K

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FTM BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION: 1. CONCRETE VESTIBULE BOTTOM STEP & FLOOR OBSERVED CRACKED & SLOPING WITH POTENTIAL TO COLLAPSE; 2. SUPER SOUTH APT OBSERVED WITH OBSTRUCTED

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.