What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Stop Work Order; Demolition. The hearing date is October 5, 2026; the source issue date(s) are January 8, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Stop Work Order — Summons 39535783J
CLASS - 1 · Issued January 8, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: JOBSITE WITH COMPLETED FULL DEMOLITION WITH WORK COMPLETE UNDER PARTIAL STOP WORK ORDER. STOP WORK ORDER ISSUED 7-24-2024 UNDER COMPLAINT 2331271 WITH PARTIAL RESCIND ONLY ALLOWING INSTALLATION OF SIDEWALK SHED
Cited provision(s): 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
How this type of condition is typically resolved
An active Stop Work Order has to be treated separately from the underlying summons. The cited unsafe or unpermitted condition must be corrected or legalized, required permits/penalties addressed, and the issuing agency must formally rescind or modify the order before prohibited work resumes.
Hearing issues to verify
- What exact work was covered by the Stop Work Order: all work or only part of the project?
- Was the activity observed after the order actually prohibited work, or was it authorized safety / emergency / corrective work?
- Was the Stop Work Order already rescinded or modified before the activity alleged in the summons?
Evidence that may matter
- Copy of the Stop Work Order and any rescission/modification notice
- DOB permit records and inspector correspondence
- Daily logs, photographs and contractor records showing when work stopped or resumed
- Evidence identifying any limited corrective/safety work performed
Demolition — Summons 39535785N
CLASS - 1 · Issued January 8, 2025; hearing October 5, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: FULL DEMOLITION FOR 2 STORY BUILDING COMPLETE & JOBSITE IS FENCED/FILLED TO GRADE. UPON REVIEW OF DOB SYSTEMS, THERE HAS BEEN NO NOTIFICATION MADE TO THE DEPARTMENT FOR THE DEMOLITION WORK. STOP ALL PLANNED WOR
Cited provision(s): 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.