Bronx property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBronx
BIN2010123
Block / Lot02958 / 0054
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557993P (source ECB number 39557993P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557993P
ACTIVE
October 30, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. REQUIRED VERTICAL WAS NOT PROVIDED AT EXPOSURES 2 AND 4. CONDITION MAY ALLOW FALLING MATERIALS TO REACH THE PUBLIC WA 1P7
39557991L
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $1,250.00 AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. SIDEWALK SHED AT EXPOSURE 2 WAS NOT EXTENDED THE REQUIRED 5 FEET OVER THE SIDEWALK. CONDITION DOES NOT PROVIDE REQUIR 1N8
39557994R
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. NO ADEQUATE OVERHEAD PROTECTION WAS PROVIDED OVER THE ADJACENT BUILDING ROOF AT 1827 WATERLOO PLACE, EXPOSURE 2. COND 1P4
39557992N
ACTIVE
October 30, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. PEDESTRIAN WALKWAY AT EXPOSURE 2 WAS LESS THAN 4 FEET WIDE AND UNEVEN, CREATING A TRIP HAZARD AND RESTRICTING SAFE PE 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Other Building / Code Compliance summonses; Sidewalk Shed / Scaffold. The hearing date is October 30, 2026; the source issue date(s) are August 16, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557993P

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. REQUIRED VERTICAL WAS NOT PROVIDED AT EXPOSURES 2 AND 4. CONDITION MAY ALLOW FALLING MATERIALS TO REACH THE PUBLIC WA

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39557991L

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. SIDEWALK SHED AT EXPOSURE 2 WAS NOT EXTENDED THE REQUIRED 5 FEET OVER THE SIDEWALK. CONDITION DOES NOT PROVIDE REQUIR

Cited provision(s): 1N8

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Other Building / Code Compliance — Summons 39557994R

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. NO ADEQUATE OVERHEAD PROTECTION WAS PROVIDED OVER THE ADJACENT BUILDING ROOF AT 1827 WATERLOO PLACE, EXPOSURE 2. COND

Cited provision(s): 1P4

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557992N

CLASS - 2 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING WITH WORK DECK AT 4TH-FLOOR LEVEL. PEDESTRIAN WALKWAY AT EXPOSURE 2 WAS LESS THAN 4 FEET WIDE AND UNEVEN, CREATING A TRIP HAZARD AND RESTRICTING SAFE PE

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.