What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; 2 Illegal Occupancy / Conversion summonses; Egress / Exit Obstruction. The hearing date is October 16, 2026; the source issue date(s) are February 26, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Illegal Occupancy / Conversion — Summons 39178568Y
CLASS - 1 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: OCCUPANCY CONTRARY TO JOB # XOO363155 - 1ST -2ND - 3RD FLOOR WITH CELLAR INDICATED OPEN CELLAR WITH 1 BEDROOM APARTMENT FOR THE 1ST - 2ND - 3RD FLOOR - OBSERVED - FULL CLASS "A" APT WITH 2 BEDROOM AT CELLAR - 4
Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Work Without a Permit — Summons 39178569X
CLASS - 1 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT PERMIT - WORK NOTED - AT CELLAR LEVEL, INSTALLED WATER AND WASTE LINE INSTALLED FOR TOILET - SINK - RESIDENTIAL SINK AND SHOWER - GAS LINE FOR 2 ADDITIONAL HOT WATER TANKS AND 3 ADDITIONAL BOILERS
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Egress / Exit Obstruction — Summons 39178570N
CLASS - 1 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: - FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER: LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1 (2008 CODE); 27-366; BC 1021.1 (2014CODE) - AT CELLAR LEVEL - NO 2ND MEANS OF
Cited provision(s): 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Work Without a Permit — Summons 39178571P
CLASS - 1 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT PERMIT - WORK NOTED - AT CELLAR LEVEL - ERECTED FULL HEIGHT PARTITIONS TO SUB-DIVIDE THE OPEN CELLAR TO CREATE A CLASS "A" APT WITH 3 PC BATHROOM AND 2 BEDROOMS - 1ST - 2ND - 3RD FLOOR APT ERECTED
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Illegal Occupancy / Conversion — Summons 39178572R
CLASS - 2 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: RESIDENCE CONVERTED MAINTAINED OR OOCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY OFFICAL DEPARTMENT RECORDS: HPD RECORDS INDICATES 3 FAMILY DWELLIMG - OBSERVED 4TH F
Cited provision(s): 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Work Without a Permit — Summons 39178573Z
CLASS - 2 · Issued February 26, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: WORK WITHOUT PERMITS - WORK NOTED - ELECTRICAL WORK OBSERVED APPROX 10 OUTLETS AND 6 SWITCHES AND MULTIPLE RECESS LIGHTING WITHOUT ELECTRICAL PERMITS, OBTAIN PERMIT
Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.