October 2026 NYC DOB / OATH Hearing — BIN 2012349

Bronx property record with 8 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 9, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2012349
Block / Lot03080 / 0096
October Records8
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039149075N (source ECB number 39149075N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39149073J
ACTIVE
October 9, 2026
8:30 AM
CLASS - 3 PENDING $500.00 ILLEGAL PARKING IN A RESIDENTIAL DISTRICT. NOTED: AT TIME OF INSPECTION - BLACK FORD SUV OBSERVED PARKED AT EXPOSURE 1 W/O PLATES & EXPIRED REGISTRATION, CREATING DEAD STORAGE CONDITION., CONFORM TO PARKING REG 383 — ZR 25-41 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT
39149074L
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 W/O A PERMIT. NOTED: 1. AT BSMT - WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM; RESIDENTIAL SINK AT KITCHEN AREA; WASHER. GAS LINES INSTALLED FOR DRYER, 2 BURNER STOVE TOP. 2. AT 1ST & 2ND FLRS - FOR ADDL'T 3 P 101 — 28-105.1 WORK WITHOUT A PERMIT
39149075N
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 W/O A PERMIT. NOTED: AT BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM, BDRM, KITCHEN AREA, STORAGE RMS, LAUNDRY RM., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39149076P
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION - COMBUSTIBLE MATERIAL OBSERVED STORED IN BOILER RM CONSISTING OF PLASTIC & WOOD ITEMS CREATING A FIRE HAZARD CONDITION., REPA 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39149077R
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 W/O A PERMIT. NOTED: AT BSMT - ELECTRICAL WIRING INSTALLED: 220V LINE FOR STOVE; 110V LINES FOR ADDL'T LIGHTS & OUTLETS. ELECTRICAL WIRING INSTALLATION COMPLETED WORK OBSERVED IN UNSAFE MANNER (EXPOSED WIRES & 101 — 28-105.1 WORK WITHOUT A PERMIT
39149078Z
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: AT BSMT THROUGHOUT - OPENINGS OBSERVED AT CEILINGS REMOVING FIRE STOPPING., PROVIDE/MAINTAIN FIRE STOPPING 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39149079K
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 RESIDENCE CONVERTED FROM A 2 TO 3 FAMILY NFP DWELLING. NOTED: BSMT CREATED & OCCUPIED AS A CLASS 'A' APT: HEADROOM 6 1/2' THROUGHOUT - WITH 3 PC BTHRM; KITCHEN WITH AN ELECTRIC STOVE, RESIDENTIAL SINK; 1 BDRM. 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN
39149080H
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 W/O A PERMIT. NOTED: 1. AT BSMT - 2 NEW GAS OPERATED COMBI BOILERS, GAS PIPING & COPPER WATER LINES INSTALLED. 2. NEW ELECTRICAL WIRING INSTALLED AT 1ST FLR FOR CIRCUIT PANEL BOX, BRANCH CIRCUITS, LIGHTS, SWITC 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 8 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; Zoning / Parking / Use; Boiler / HVAC / Service Equipment; Failure to Maintain; Illegal Occupancy / Conversion. The hearing date is October 9, 2026; the source issue date(s) are May 27, 2025.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Zoning / Parking / Use — Summons 39149073J

CLASS - 3 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ILLEGAL PARKING IN A RESIDENTIAL DISTRICT. NOTED: AT TIME OF INSPECTION - BLACK FORD SUV OBSERVED PARKED AT EXPOSURE 1 W/O PLATES & EXPIRED REGISTRATION, CREATING DEAD STORAGE CONDITION., CONFORM TO PARKING REG

Cited provision(s): 383 — ZR 25-41 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT

How this type of condition is typically resolved

Zoning charges require comparing the observed use, parking arrangement or physical condition to the applicable zoning district, lawful occupancy and any prior approvals or variances. Correction can mean stopping the use, restoring required parking, or pursuing a lawful approval if available.

Hearing issues to verify

  • Is the cited zoning district/use classification correct for this lot?
  • Was the alleged use actually occurring on the issue date?
  • Is there a prior BSA/CPC/DOB approval, variance or grandfathered condition relevant to the charge?

Evidence that may matter

  • Zoning map and ZOLA/property records
  • Certificate of Occupancy / approved plans
  • Survey or parking layout
  • Prior approvals, variances, permits and dated photographs

Work Without a Permit — Summons 39149074L

CLASS - 1 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: 1. AT BSMT - WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM; RESIDENTIAL SINK AT KITCHEN AREA; WASHER. GAS LINES INSTALLED FOR DRYER, 2 BURNER STOVE TOP. 2. AT 1ST & 2ND FLRS - FOR ADDL'T 3 P

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39149075N

CLASS - 2 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: AT BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM, BDRM, KITCHEN AREA, STORAGE RMS, LAUNDRY RM., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Boiler / HVAC / Service Equipment — Summons 39149076P

CLASS - 1 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION - COMBUSTIBLE MATERIAL OBSERVED STORED IN BOILER RM CONSISTING OF PLASTIC & WOOD ITEMS CREATING A FIRE HAZARD CONDITION., REPA

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39149077R

CLASS - 1 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: AT BSMT - ELECTRICAL WIRING INSTALLED: 220V LINE FOR STOVE; 110V LINES FOR ADDL'T LIGHTS & OUTLETS. ELECTRICAL WIRING INSTALLATION COMPLETED WORK OBSERVED IN UNSAFE MANNER (EXPOSED WIRES &

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39149078Z

CLASS - 1 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: AT BSMT THROUGHOUT - OPENINGS OBSERVED AT CEILINGS REMOVING FIRE STOPPING., PROVIDE/MAINTAIN FIRE STOPPING

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Illegal Occupancy / Conversion — Summons 39149079K

CLASS - 2 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE CONVERTED FROM A 2 TO 3 FAMILY NFP DWELLING. NOTED: BSMT CREATED & OCCUPIED AS A CLASS 'A' APT: HEADROOM 6 1/2' THROUGHOUT - WITH 3 PC BTHRM; KITCHEN WITH AN ELECTRIC STOVE, RESIDENTIAL SINK; 1 BDRM.

Cited provision(s): 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39149080H

CLASS - 1 · Issued May 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: W/O A PERMIT. NOTED: 1. AT BSMT - 2 NEW GAS OPERATED COMBI BOILERS, GAS PIPING & COPPER WATER LINES INSTALLED. 2. NEW ELECTRICAL WIRING INSTALLED AT 1ST FLR FOR CIRCUIT PANEL BOX, BRANCH CIRCUITS, LIGHTS, SWITC

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 8 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.