October 2026 NYC DOB / OATH Hearing — BIN 2014969

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 5, 2026, October 23, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2014969
Block / Lot03225 / 0175
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039150679M (source ECB number 39150679M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39139314M
ACTIVE
October 5, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 FULL HEIGHT PARTITIONS INCLUDING ENTRY DOORS AND INTERIOR WINDOWS ERECTED AT FIRST FLOOR AND CELLAR IN ORDER TO CREATE THREE ROOMS AT FIRST FLOOR AND FOUR ROOMS AT CELLAR. OBSERVED ILLEGAL THREE PIECE BATHROOM 101 — 28-105.1 WORK WITHOUT A PERMIT
39139317H
ACTIVE
October 5, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 THREE SINGLE ROOMS CREATED AT FIRST FLOOR APARTMENT AND FOUR ROOMS AT CELLAR. ROOM AT FIRST FLOOR OCCUPIED AS SRO. TWO ROOMS AT CELLAR OCCUPIED AS SRO'S BY TWO MALE INDIVIDUALS. OBSERVED BEDS WITH SHEETS, MICRO 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39150679M
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 DURING THE INSPECTION, IT WAS OBSERVED THAT THE FIRE STOPPING WAS MISSING FROM THE CEILINGS TO THE OCCUPIED FLOOR ABOVE, AS WELL AS FROM THE ADJACENT WALL TO THE HALLWAY., PROVIDE/MAINTAIN FIRE STOPPING 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39150680J
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $12,500.00 DURING THE INSPECTION, IT WAS OBSERVED THAT DEMOLITION WORK WAS UNDERWAY ON THE FIRST FLOOR WITHOUT A PERMANENT PERMIT ON FILE. ADDITIONALLY, THERE WERE PILES OF CONSTRUCTION DEBRIS, A MISSING STAIRCASE, AND DU 101 — 28-105.1 WORK WITHOUT A PERMIT
39193407Z
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI, WWOP: OBSERVED PLUMBING WORK IS PROCEEDING IN THE BASEMENT WITHOUT THE REQUIRED PERMIT. THE PROJECT INVOLVES INSTALLING CAST-IRON WASTE LINES THROUGHOUT THE BASEMENT THAT EXTEND TO THE FIRST FLOOR, AND TH 101 — 28-105.1 WORK WITHOUT A PERMIT
39193408K
ACTIVE
October 23, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI, WWOP CONSTRUCTION ACTIVITY ON THE FIRST AND SECOND FLOORS WAS OBSERVED WITHOUT A PERMIT ON FILE FOR THE SCOPE OF WORK. IT APPEARS THAT FRAMING FOR CEILINGS AND PARTITION WORK IS IN PROGRESS. THE PERMIT AS 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; Illegal Occupancy / Conversion; Failure to Maintain. The hearing dates are October 23, 2026, October 5, 2026; the source issue date(s) are February 24, 2025, June 10, 2025, June 23, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39139314M

CLASS - 1 · Issued February 24, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FULL HEIGHT PARTITIONS INCLUDING ENTRY DOORS AND INTERIOR WINDOWS ERECTED AT FIRST FLOOR AND CELLAR IN ORDER TO CREATE THREE ROOMS AT FIRST FLOOR AND FOUR ROOMS AT CELLAR. OBSERVED ILLEGAL THREE PIECE BATHROOM

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39139317H

CLASS - 1 · Issued February 24, 2025; hearing October 5, 2026. · Hearing status: PENDING

DOB allegation in the source extract: THREE SINGLE ROOMS CREATED AT FIRST FLOOR APARTMENT AND FOUR ROOMS AT CELLAR. ROOM AT FIRST FLOOR OCCUPIED AS SRO. TWO ROOMS AT CELLAR OCCUPIED AS SRO'S BY TWO MALE INDIVIDUALS. OBSERVED BEDS WITH SHEETS, MICRO

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Failure to Maintain — Summons 39150679M

CLASS - 1 · Issued June 10, 2025; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING THE INSPECTION, IT WAS OBSERVED THAT THE FIRE STOPPING WAS MISSING FROM THE CEILINGS TO THE OCCUPIED FLOOR ABOVE, AS WELL AS FROM THE ADJACENT WALL TO THE HALLWAY., PROVIDE/MAINTAIN FIRE STOPPING

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39150680J

CLASS - 1 · Issued June 10, 2025; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING THE INSPECTION, IT WAS OBSERVED THAT DEMOLITION WORK WAS UNDERWAY ON THE FIRST FLOOR WITHOUT A PERMANENT PERMIT ON FILE. ADDITIONALLY, THERE WERE PILES OF CONSTRUCTION DEBRIS, A MISSING STAIRCASE, AND DU

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39193407Z

CLASS - 1 · Issued June 23, 2026; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, WWOP: OBSERVED PLUMBING WORK IS PROCEEDING IN THE BASEMENT WITHOUT THE REQUIRED PERMIT. THE PROJECT INVOLVES INSTALLING CAST-IRON WASTE LINES THROUGHOUT THE BASEMENT THAT EXTEND TO THE FIRST FLOOR, AND TH

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39193408K

CLASS - 1 · Issued June 23, 2026; hearing October 23, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, WWOP CONSTRUCTION ACTIVITY ON THE FIRST AND SECOND FLOORS WAS OBSERVED WITHOUT A PERMIT ON FILE FOR THE SCOPE OF WORK. IT APPEARS THAT FRAMING FOR CEILINGS AND PARTITION WORK IS IN PROGRESS. THE PERMIT AS

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.