What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Construction Fence. The hearing date is October 30, 2026; the source issue date(s) are August 16, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Site Safety / Safeguarding — Summons 39557980X
CLASS - 2 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION OF THE PARTIAL DEMOLITION 3-STORY BUILDING, NO PROJECT INFORMATION PANEL WAS INSTALLED ON THE CONSTRUCTION SITE/FENCE. CONDITION DOES NOT CONFORM TO BC 3301.9, WHICH REQUIRES A COMPLIA
Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Construction Fence — Summons 39557981H
CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION OF THE PARTIAL DEMOLITION 3-STORY BUILDING, CONSTRUCTION FENCE SHOWED DEFICIENCIES. AT EXPOSURE#1, MISSING VIEWING TRANSPARENT PANEL, PORTIONS OF PLYWOOD NOT PROPERLY SECURED AND AT EX
Cited provision(s): 1P7
How this type of condition is typically resolved
Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.
Hearing issues to verify
- Did the fence configuration on the inspection date match the approved/logistics plan?
- Was the cited opening or defect temporary and promptly corrected?
- Was a permit or construction-fence filing active where required?
Evidence that may matter
- Approved construction-fence/site logistics documents
- Dated photographs
- Contractor logs and correction invoice
- Permit/filing record
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review