BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2016263

Bronx property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 2, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2016263
Block / Lot03273 / 0265
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557259K (source ECB number 39557259K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557259K
ACTIVE
October 2, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 2 STORY ALT OF EXISTING BUILDING ACTIVE SITE.WOOD JOISTS, COLD FORM STEEL (CFS), STRUCTURAL STEEL, TRUSS SYSTEMS INSTALLED CONTRARY TO PLANS.EXISTING BRICK WALL NOT REPAIRED EXP#2.NO DETAILS FOR I BEAM ON BRICK 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
39557280P
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 2 STORY ALT ACTIVE SITE. CONTRARY TO SITE SAFETY PLANS/CODE.MISSING PROTECTION ROOF COPING STONES & WINDOW PROTECTION OF ADJOINING PROPERTIES AT EXP#2,3,4. OBSERVED UNFINISHED EXTERIOR WORK AT AREAS APPROX. 5 F 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557282Z
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 2 STORY ALT ACTIVE SITE.OBSERVED MANUAL CHAIN HOISTING EQUIPMENT ONSITE AT MULTIPLE LOCATIONS ATTACHED TO STRUCTURAL STEEL. UPON REQUEST FOR APPROVED PLANS & MANUFACTURER SPECIFICATIONS/NONE PROVIDED/READILY AV 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39557281R
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 2 STORY ALTERATION ACTIVE SITE. OBSERVED SUPPORTED SCAFFOLDING IN PLACE/USE AT EXP#1,3 PERMIT#X01304699. CONTRARY TO PLANS AT EXP#1 2 FT FRAMES BY STAIR TOWER PLANS SHOW 3'-6" SCAFFOLD ATTACHED TO SIDEWALK SHED 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Site Safety / Safeguarding. The hearing dates are October 16, 2026, October 2, 2026; the source issue date(s) are July 29, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39557259K

CLASS - 1 · Issued July 29, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 2 STORY ALT OF EXISTING BUILDING ACTIVE SITE.WOOD JOISTS, COLD FORM STEEL (CFS), STRUCTURAL STEEL, TRUSS SYSTEMS INSTALLED CONTRARY TO PLANS.EXISTING BRICK WALL NOT REPAIRED EXP#2.NO DETAILS FOR I BEAM ON BRICK

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39557280P

CLASS - 2 · Issued July 29, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 2 STORY ALT ACTIVE SITE. CONTRARY TO SITE SAFETY PLANS/CODE.MISSING PROTECTION ROOF COPING STONES & WINDOW PROTECTION OF ADJOINING PROPERTIES AT EXP#2,3,4. OBSERVED UNFINISHED EXTERIOR WORK AT AREAS APPROX. 5 F

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Site Safety / Safeguarding — Summons 39557282Z

CLASS - 1 · Issued July 29, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 2 STORY ALT ACTIVE SITE.OBSERVED MANUAL CHAIN HOISTING EQUIPMENT ONSITE AT MULTIPLE LOCATIONS ATTACHED TO STRUCTURAL STEEL. UPON REQUEST FOR APPROVED PLANS & MANUFACTURER SPECIFICATIONS/NONE PROVIDED/READILY AV

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Work Without a Permit — Summons 39557281R

CLASS - 2 · Issued July 29, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 2 STORY ALTERATION ACTIVE SITE. OBSERVED SUPPORTED SCAFFOLDING IN PLACE/USE AT EXP#1,3 PERMIT#X01304699. CONTRARY TO PLANS AT EXP#1 2 FT FRAMES BY STAIR TOWER PLANS SHOW 3'-6" SCAFFOLD ATTACHED TO SIDEWALK SHED

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.