October 2026 NYC DOB / OATH Hearing — BIN 2017188

Bronx property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 16, 2026, October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBronx
BIN2017188
Block / Lot03305 / 0062
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557661Z (source ECB number 39557661Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557661Z
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME INSPECTION 12-STORY NB TOPPED OFF, RESPONDING TO AN INCIDENT WHERE A FEMALE WORKER WAS HANDLING MATERIALS ON THE 9TH FLOOR, TAKEN IT UP TO THE 10TH FLOOR 2 BY 2 FRAMING TUBE, REVIEW THE SCOPE OF WOR 1K1 — BC 3301.12.2 FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRE-SHIF
39557985P
ACTIVE
October 30, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 DURING MY INSPECTION OF A 12-STORY NB. I ACKNOWLEDGE ACTIVE CONSTRUCTION ACTIVITIES AT THE SITE, WITH ONGOING PERIMETER AND INTERIOR METAL FRAMING. I REVIEWED THE DOB NOW AND BIS WEBSITES AND FOUND NO ISSUED AH 1C6 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
39557998Y
ACTIVE
October 30, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OF AN ACTIVE 12-STORY NEW BUILDING. I REQUESTED DESIGN DRAWINGS FOR THE PLATFORM AT THE ROOF LEVEL; NONE WERE PROVIDED. NO DD AND NO APPROVED SITE SAFETY PLAN. STOP ALL WORK UNDER P 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39557901Z
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION OF A 12-STORY NEW BUILDING AT THE ROOF, ACTIVE JOBSITE OBSERVED AT EXPOSURE #2. NEEDLE BEAM WAS ERECTED IN CONJUNCTION WITH PIPE SCAFFOLDING. REVIEW OF THE APPROVED SITE SAFETY PLAN RE 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
39557999X
ACTIVE
October 30, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 DURING MY INSPECTION, I OBSERVED INADEQUATE HOUSEKEEPING. SUPPORTED SCAFFOLD WITH DEBRIS NETTING; EXPOSURE ONE WAS NOT CLEANED OF STUCCO PARTICLES TO PREVENT THEM FROM FALLING ONTO THE PUBLIC WALKWAY. STOP ALL 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
39557997M
ACTIVE
October 30, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 DURING MY INSPECTION OF AN ACTIVE 12-STORY NB, WITH ONGOING METAL FRAMING AT THE PERIMETER AND INTERIOR WALLS. I OBSERVED NO SITE SAFETY MONITORING PROGRAM IN PLACE AND NO DESIGNATED SITE SAFETY MANAGER OR COOR 1P7
39558000X
ACTIVE
October 30, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 3301.2. DURING MY INSPECTION. I OBSERVED AN ACTIVE 12-STORY NB WITH INADEQUATE SAFETY MEASURES IN PLACE, PERIMETER VERTICAL NETTING NOT TIED DOWN TO ZERO CABLE, MISSING HANDRAILS, AND FALL ARREST AT THE STAIRS 1P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 3 Site Safety / Safeguarding summonses; 2 Work Without a Permit summonses; Other Building / Code Compliance; Sidewalk Shed / Scaffold. The hearing dates are October 16, 2026, October 30, 2026; the source issue date(s) are August 13, 2026, August 16, 2026, August 7, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557661Z

CLASS - 1 · Issued August 7, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME INSPECTION 12-STORY NB TOPPED OFF, RESPONDING TO AN INCIDENT WHERE A FEMALE WORKER WAS HANDLING MATERIALS ON THE 9TH FLOOR, TAKEN IT UP TO THE 10TH FLOOR 2 BY 2 FRAMING TUBE, REVIEW THE SCOPE OF WOR

Cited provision(s): 1K1 — BC 3301.12.2 FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRE-SHIF

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Work Without a Permit — Summons 39557985P

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING MY INSPECTION OF A 12-STORY NB. I ACKNOWLEDGE ACTIVE CONSTRUCTION ACTIVITIES AT THE SITE, WITH ONGOING PERIMETER AND INTERIOR METAL FRAMING. I REVIEWED THE DOB NOW AND BIS WEBSITES AND FOUND NO ISSUED AH

Cited provision(s): 1C6 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Site Safety / Safeguarding — Summons 39557998Y

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OF AN ACTIVE 12-STORY NEW BUILDING. I REQUESTED DESIGN DRAWINGS FOR THE PLATFORM AT THE ROOF LEVEL; NONE WERE PROVIDED. NO DD AND NO APPROVED SITE SAFETY PLAN. STOP ALL WORK UNDER P

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Work Without a Permit — Summons 39557901Z

CLASS - 1 · Issued August 13, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 12-STORY NEW BUILDING AT THE ROOF, ACTIVE JOBSITE OBSERVED AT EXPOSURE #2. NEEDLE BEAM WAS ERECTED IN CONJUNCTION WITH PIPE SCAFFOLDING. REVIEW OF THE APPROVED SITE SAFETY PLAN RE

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Sidewalk Shed / Scaffold — Summons 39557999X

CLASS - 2 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING MY INSPECTION, I OBSERVED INADEQUATE HOUSEKEEPING. SUPPORTED SCAFFOLD WITH DEBRIS NETTING; EXPOSURE ONE WAS NOT CLEANED OF STUCCO PARTICLES TO PREVENT THEM FROM FALLING ONTO THE PUBLIC WALKWAY. STOP ALL

Cited provision(s): 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39557997M

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING MY INSPECTION OF AN ACTIVE 12-STORY NB, WITH ONGOING METAL FRAMING AT THE PERIMETER AND INTERIOR WALLS. I OBSERVED NO SITE SAFETY MONITORING PROGRAM IN PLACE AND NO DESIGNATED SITE SAFETY MANAGER OR COOR

Cited provision(s): 1P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39558000X

CLASS - 1 · Issued August 16, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3301.2. DURING MY INSPECTION. I OBSERVED AN ACTIVE 12-STORY NB WITH INADEQUATE SAFETY MEASURES IN PLACE, PERIMETER VERTICAL NETTING NOT TIED DOWN TO ZERO CABLE, MISSING HANDRAILS, AND FALL ARREST AT THE STAIRS

Cited provision(s): 1P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.