What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: Boiler / HVAC / Service Equipment; Façade / Exterior Wall; Egress / Exit Obstruction. The hearing dates are October 13, 2026, October 19, 2026; the source issue date(s) are July 1, 2025, September 10, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Boiler / HVAC / Service Equipment — Summons 37035969Y
CLASS - 2 · Issued July 1, 2025; hearing October 13, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 20000011097Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO
Cited provision(s): 265 — 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT.
How this type of condition is typically resolved
Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.
Hearing issues to verify
- Was the cited device in service at the time alleged?
- Was the equipment already repaired, disconnected or removed?
- Do required annual inspection / filing records show compliance for the relevant cycle?
Evidence that may matter
- Licensed contractor maintenance/repair records
- Inspection and testing results
- Device-status or annual filing records
- Utility/CO testing records and photographs where relevant
Façade / Exterior Wall — Summons 35717639R
CLASS - 1 · Issued September 10, 2025; hearing October 19, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 WEST, #2 NORTH, #3 EAST, #4 SOUTH-CRACKED/SPALLING BRICK AT PARAPET LEVEL MULTI LOC.-EXP #1 WEST, #2 NO
Cited provision(s): 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Egress / Exit Obstruction — Summons 35717640Y
CLASS - 1 · Issued September 10, 2025; hearing October 19, 2026. · Hearing status: DEFAULT
DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.-NOTE: AT TIME OF INSPECTION I OBSERVED OBJECTS ON FIRE ESCAPE LANDINGS AT EXP #2 NORTH, #3 EAST MULTI LOC.-EXP #2 NORTH-DEFECTIVE FIRE ESCAPE DROP LADDER IS DETA
Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
How this type of condition is typically resolved
Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.
Hearing issues to verify
- Was the cited passageway actually required egress for the affected occupancy?
- Did the alleged obstruction exist when the inspector observed it?
- Was the condition immediately removed and can the timing be documented?
Evidence that may matter
- Dated photographs showing the exit path
- Approved floor/egress plans
- Building or security logs
- Statements or work records documenting removal of stored items/obstructions
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.