We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBronx
BIN2017539
Block / Lot03318 / 0119
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035727023H (source ECB number 35727023H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35727023H
ACTIVE
October 2, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION, I OBSERVED EXP #1 NORTH 91)CRACKED DISPLACED BRICK NORTH EAST CORNER OF 6TH FL. LEVEL (2) INADEQUATE REPAIRS/CRACKED 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
39557798J
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT TIME OF INSPECTION, OBSERVED ACTIVE PARAPET DEMOLITION AND HOIST OPERATIONS AT ROOF LEVEL OF OCCUPIED 6-STORY BUILDING. APPROVED PLANS AND REQUIRED DOCUMENTS FOR THE PARAPET WORK AND HOIST WERE NOT PROVIDED 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39557797H
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION, OBSERVED ACTIVE PARAPET DEMOLITION AT ROOF LEVEL OF OCCUPIED 6-STORY BUILDING. PARAPET REMOVED, LEAVING AN OPEN EDGE AT THE WORK AREA. HOIST AREA ALSO HAD MINIMAL GUARDRAILS. NO CAZ, BARR 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39557799L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 AT TIME OF INSPECTION, OBSERVED ONGOING PARAPET DEMOLITION AND CONSTRUCTION AT EXPOSURES 2, 3 AND 4 OF OCCUPIED 6-STORY BUILDING. NO WINDOW PROTECTION WAS PROVIDED AT THE ACTIVE WORK AREAS. INADEQUATE ROOF PROT 2P4
39557801L
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 AT TIME OF INSPECTION, OBSERVED DUMPSTER CONTAINING BRICK DEBRIS AT EXPOSURE 1 OF OCCUPIED 6-STORY BUILDING. REQUIRED 4-FOOT BARRIER AND MESH WERE NOT PROVIDED AROUND THE STORAGE ZONE. CONDITION CREATES A HAZAR 2P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 2 Site Safety / Safeguarding summonses; Façade / Exterior Wall; Demolition; Other Building / Code Compliance. The hearing dates are October 16, 2026, October 2, 2026; the source issue date(s) are August 11, 2026, March 21, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Façade / Exterior Wall — Summons 35727023H

CLASS - 1 · Issued March 21, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION, I OBSERVED EXP #1 NORTH 91)CRACKED DISPLACED BRICK NORTH EAST CORNER OF 6TH FL. LEVEL (2) INADEQUATE REPAIRS/CRACKED

Cited provision(s): 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

How this type of condition is typically resolved

Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.

Hearing issues to verify

  • Does the inspector's description match the actual exposure, floor and defect?
  • Was the condition already repaired or protected before the summons date?
  • Was there a current FISP/QEWI filing addressing the same condition?

Evidence that may matter

  • QEWI report, FISP filing or amended report
  • Close-up and elevation photographs identifying the exact defect
  • Repair proposals, invoices and completion records
  • Engineer/architect letter and inspection documentation

Site Safety / Safeguarding — Summons 39557798J

CLASS - 1 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED ACTIVE PARAPET DEMOLITION AND HOIST OPERATIONS AT ROOF LEVEL OF OCCUPIED 6-STORY BUILDING. APPROVED PLANS AND REQUIRED DOCUMENTS FOR THE PARAPET WORK AND HOIST WERE NOT PROVIDED

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557797H

CLASS - 1 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED ACTIVE PARAPET DEMOLITION AT ROOF LEVEL OF OCCUPIED 6-STORY BUILDING. PARAPET REMOVED, LEAVING AN OPEN EDGE AT THE WORK AREA. HOIST AREA ALSO HAD MINIMAL GUARDRAILS. NO CAZ, BARR

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Demolition — Summons 39557799L

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED ONGOING PARAPET DEMOLITION AND CONSTRUCTION AT EXPOSURES 2, 3 AND 4 OF OCCUPIED 6-STORY BUILDING. NO WINDOW PROTECTION WAS PROVIDED AT THE ACTIVE WORK AREAS. INADEQUATE ROOF PROT

Cited provision(s): 2P4

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Other Building / Code Compliance — Summons 39557801L

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, OBSERVED DUMPSTER CONTAINING BRICK DEBRIS AT EXPOSURE 1 OF OCCUPIED 6-STORY BUILDING. REQUIRED 4-FOOT BARRIER AND MESH WERE NOT PROVIDED AROUND THE STORAGE ZONE. CONDITION CREATES A HAZAR

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.