Bronx property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 2, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBronx
BIN2018266
Block / Lot03344 / 0036
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035729913Z (source ECB number 35729913Z). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35729913Z
ACTIVE
October 2, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 EXPIRED SIDEWALK SHED PERMIT. NOTED AT THE TIME OF INSPECTION I OBSERVED THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I CHECKED ON THE SITE AND FOUND THAT NO PERMIT WAS DISPLAYED. AT PREMISES, I THEN CHECKED THE 2P8
35729914K
ACTIVE
October 2, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED AT THE TIME OF INSPECTION I OBSERVED FLOWER POTS ARE STORED ON THE FIRE ESCAPE HORIZONTAL LANDINGS AT EXPOSURE 2 ON 5TH FLOOR THE STORAGE OF THESE ITEMS CR 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
35729915M
ACTIVE
October 2, 2026
10:30 AM
CLASS - 2 PENDING $2,400.00 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE/INADEQUATE SHED CONDITIONS I. E. DAMAGED/ROTTED MUDSILLS ON MULTIPLE LOCATIONS AND MISSING PARAPET P 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
39199817Z
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIMES OF INSPECTION OBSERVED AT INTERIOR WEST SIDE 2ND FLOOR HALLWAY MISCELLANEOUS HOUSEHOLD ITEMS PARTIALLY OBSTRUCTING HALLWAYS CREATING HAZARDOUS CON 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses; Egress / Exit Obstruction; Failure to Maintain. The hearing dates are October 16, 2026, October 2, 2026; the source issue date(s) are August 8, 2026, July 24, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 35729913Z

CLASS - 2 · Issued July 24, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: EXPIRED SIDEWALK SHED PERMIT. NOTED AT THE TIME OF INSPECTION I OBSERVED THAT PERMIT FOR SIDEWALK SHED HAD EXPIRED. I CHECKED ON THE SITE AND FOUND THAT NO PERMIT WAS DISPLAYED. AT PREMISES, I THEN CHECKED THE

Cited provision(s): 2P8

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Egress / Exit Obstruction — Summons 35729914K

CLASS - 1 · Issued July 24, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED AT THE TIME OF INSPECTION I OBSERVED FLOWER POTS ARE STORED ON THE FIRE ESCAPE HORIZONTAL LANDINGS AT EXPOSURE 2 ON 5TH FLOOR THE STORAGE OF THESE ITEMS CR

Cited provision(s): 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Sidewalk Shed / Scaffold — Summons 35729915M

CLASS - 2 · Issued July 24, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE/INADEQUATE SHED CONDITIONS I. E. DAMAGED/ROTTED MUDSILLS ON MULTIPLE LOCATIONS AND MISSING PARAPET P

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Failure to Maintain — Summons 39199817Z

CLASS - 2 · Issued August 8, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIMES OF INSPECTION OBSERVED AT INTERIOR WEST SIDE 2ND FLOOR HALLWAY MISCELLANEOUS HOUSEHOLD ITEMS PARTIALLY OBSTRUCTING HALLWAYS CREATING HAZARDOUS CON

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.