What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses; Work Without a Permit; Illegal Occupancy / Conversion. The hearing dates are October 14, 2026, October 2, 2026; the source issue date(s) are July 22, 2026, July 31, 2025.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Sidewalk Shed / Scaffold — Summons 39556900M
CLASS - 2 · Issued July 22, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION, OCCUPIED 6-STORY BUILDING OBSERVED WITH SIDEWALK SHED LIGHTING NOT PROPERLY MAINTAINED. ONLY MINIMAL LIGHTING WAS PROVIDED BENEATH THE SHED, LEAVING PORTIONS OF THE PEDESTRIAN WALKWAY INA
Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Sidewalk Shed / Scaffold — Summons 39556901Y
CLASS - 2 · Issued July 22, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION, OCCUPIED 6-STORY BUILDING OBSERVED WITH SIDEWALK SHED PERMIT #X01211409 EXPIRED ON 06/06/2026. SIDEWALK SHED IN PLACE WITHOUT A VALID PERMIT. FAILURE TO MAINTAIN A VALID PERMIT FOR PEDEST
Cited provision(s): 2P8
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Work Without a Permit — Summons 39155665Y
CLASS - 1 · Issued July 31, 2025; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FULL HEIGHT PARTITIONS HAS BEEN ERECTED FOR THE BATHROOMS LOCATED AT LARGE AND SMALL STORAGE ROOMS. ALSO, FULL HEIGHT PARTITION BEEN ERECTED IN LAUNDRY ROOM., OBTAIN PERMIT
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Illegal Occupancy / Conversion — Summons 39155666X
CLASS - 1 · Issued July 31, 2025; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: ROOM2 2ND GAS METER ROOM AT END OF HALL, TURNED INTO LIVING ROOM AREA AND STORAGE UNIT FOR BUILDING., RESTORE TO PRIOR LEGAL CONDITION
Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
How this type of condition is typically resolved
The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.
Hearing issues to verify
- What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
- Did the inspector accurately identify how the space was being used on the cited date?
- Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
- Is there an approved filing or historical record supporting the present use?
Evidence that may matter
- Certificate of Occupancy / Schedule of Occupancy and approved plans
- Historic occupancy records, permits and prior approved layouts
- Dated photographs and floor plans
- Leases, tenant records or sworn statements concerning actual use
- Permits/inspection records if the condition was legalized or restored
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.