What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: 2 Façade / Exterior Wall summonses. The hearing dates are October 16, 2026, October 30, 2026; the source issue date(s) are August 10, 2026, August 13, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Façade / Exterior Wall — Summons 35728328N
CLASS - 1 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN. AT TIME OF INSPECTION OBSERVED FACADE IN STATE OFDISREPAIR AT EXP #1 CRACK AT MULTIPLE LOCATIONS, CRACK AT CORNER OF EXP #1 AND 4. REMEDY: REPAIR OR REPLACE.
Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Façade / Exterior Wall — Summons 39200434R
CLASS - 2 · Issued August 13, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT FRONT OF BUILDING, AT LEFT SIDE, STEP CRACK APPEARS AT 1ST FLOOR AND 2ND FLOOR TOP OF WINDOW TO 3RD FLOOR WINDOW BY FIRE ESCAPE., MAINTAIN EXTERIOR BUILDING WALL
Cited provision(s): 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
How this type of condition is typically resolved
Exterior-wall charges usually require a competent inspection of the cited façade/appurtenance, repair of unsafe or deteriorated conditions, and—when the building is subject to FISP—the appropriate QEWI report or amended filing.
Hearing issues to verify
- Does the inspector's description match the actual exposure, floor and defect?
- Was the condition already repaired or protected before the summons date?
- Was there a current FISP/QEWI filing addressing the same condition?
Evidence that may matter
- QEWI report, FISP filing or amended report
- Close-up and elevation photographs identifying the exact defect
- Repair proposals, invoices and completion records
- Engineer/architect letter and inspection documentation
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.