BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2023566

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2023566
Block / Lot03717 / 0036
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039201768L (source ECB number 39201768L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39201766H
ACTIVE
October 30, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS. INSTALLED 220-VOLT LINES FOR ELECTRIC STOVE AND DRYER., OBTAIN PERMIT 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39201769N
ACTIVE
October 30, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL-HEIGHTPARTITIONS AND DOORS TO CREATE 3 ADDITIONAL ROOMS., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39201764Y
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY: NOTED C OF O #35964 INDICATES BUILDING AS 2 STORY 2 FAMILY WITH CELLAR AS BOILER, STORAGE. OCCUPANCY CONTRARY OBSERVED AT CELLAR LEVEL SET-UP AND OCCUPIED AS CLASS "A" APARTMENT WITH KITCHEN 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39201767J
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT CELLAR LEVEL BOILER ROOM STORAGE OF COMBUSTIBLE MATERIALS PLASTIC BAGS, CONTAINERS, PAILS, CARDBOARD AND A WORKING ELECTRIC DRYER CAUSING A FIRE H 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39201765X
ACTIVE
October 30, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, AND SHOWER., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39201768L
ACTIVE
October 30, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT FRONT ENTRANCE HALL AT FIRST FLOOR HALLWAY OBSTRUCTED BY STROLLER, PLASTIC PINS, AND CAR PARTS., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Illegal Occupancy / Conversion; Boiler / HVAC / Service Equipment; Failure to Maintain. The hearing date is October 30, 2026; the source issue date(s) are August 25, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39201766H

CLASS - 1 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS. INSTALLED 220-VOLT LINES FOR ELECTRIC STOVE AND DRYER., OBTAIN PERMIT

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39201769N

CLASS - 2 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL-HEIGHTPARTITIONS AND DOORS TO CREATE 3 ADDITIONAL ROOMS., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39201764Y

CLASS - 1 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY: NOTED C OF O #35964 INDICATES BUILDING AS 2 STORY 2 FAMILY WITH CELLAR AS BOILER, STORAGE. OCCUPANCY CONTRARY OBSERVED AT CELLAR LEVEL SET-UP AND OCCUPIED AS CLASS "A" APARTMENT WITH KITCHEN

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Boiler / HVAC / Service Equipment — Summons 39201767J

CLASS - 1 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT CELLAR LEVEL BOILER ROOM STORAGE OF COMBUSTIBLE MATERIALS PLASTIC BAGS, CONTAINERS, PAILS, CARDBOARD AND A WORKING ELECTRIC DRYER CAUSING A FIRE H

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39201765X

CLASS - 2 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, AND SHOWER., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39201768L

CLASS - 1 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT FRONT ENTRANCE HALL AT FIRST FLOOR HALLWAY OBSTRUCTED BY STROLLER, PLASTIC PINS, AND CAR PARTS., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.