October 2026 NYC DOB / OATH Hearing — BIN 2025672

Bronx property record with 9 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 9, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Illegal Occupancy / Conversion

BoroughBronx
BIN2025672
Block / Lot03788 / 0055
October Records9
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039177179X (source ECB number 39177179X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39177174R
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 4TH ROOM FROM REAR OCCUPIED AS SRO WITH KEY L 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39177175Z
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT FIRST FLOOR PUBLIC HALLWAY OBSTRUCTED BY SHOE RACKS, SHOPPING CART, SHOP-VAC AND PAINT CANS, CAUSING A DRIP AND EGRESS HAZARD., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39177176K
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 2ND ROOM FROM REAR OCCUPIED AS SRO WITH KEY L 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39177177M
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS. INSTALLED 220-VOLT LINE FOR STOVE., OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39177178Y
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 3RD ROOM FROM REAR OCCUPIED AS SRO WITH KEY L 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39177179X
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED AT CELLAR BOILER ROOM CEILING FIRE STOPPING IS MISSING., PROVIDE/MAINTAIN FIRE STOPPING 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39177180N
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL HEIGHT PARTITIONS AND DOORS TO CREATE 3-PIECE BATHROOM AND 4 BEDROOMS., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39177181P
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $60,000.00 RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL REAR ROOM OCCUPIED AS SRO WITH KEY LOCK ON DO 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED
172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2
39177182R
ACTIVE
October 9, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR 3-PIECE BATHROOM (TOILET, SINK, SHOWER), AND RESIDENTIAL SINK. AT FIRST FLOOR INSTALLED WATER AND WASTE LINES FOR 2-PIECE BATHROOM 101 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 9 summons records for this property identifier. The charge mix is: 4 Illegal Occupancy / Conversion summonses; 3 Work Without a Permit summonses; Egress / Exit Obstruction; Boiler / HVAC / Service Equipment. The hearing date is October 9, 2026; the source issue date(s) are February 12, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 39177174R

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 4TH ROOM FROM REAR OCCUPIED AS SRO WITH KEY L

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Egress / Exit Obstruction — Summons 39177175Z

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT FIRST FLOOR PUBLIC HALLWAY OBSTRUCTED BY SHOE RACKS, SHOPPING CART, SHOP-VAC AND PAINT CANS, CAUSING A DRIP AND EGRESS HAZARD., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Illegal Occupancy / Conversion — Summons 39177176K

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 2ND ROOM FROM REAR OCCUPIED AS SRO WITH KEY L

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39177177M

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED ADDITIONAL 110-VOLT ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS. INSTALLED 220-VOLT LINE FOR STOVE., OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39177178Y

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL 3RD ROOM FROM REAR OCCUPIED AS SRO WITH KEY L

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Boiler / HVAC / Service Equipment — Summons 39177179X

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED AT CELLAR BOILER ROOM CEILING FIRE STOPPING IS MISSING., PROVIDE/MAINTAIN FIRE STOPPING

Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39177180N

CLASS - 2 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL ERECTED VARIOUS FULL HEIGHT PARTITIONS AND DOORS TO CREATE 3-PIECE BATHROOM AND 4 BEDROOMS., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39177181P

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATE BUILDING AS 2 STORY 2 FAMILY. HAS NOW BEEN ALTERED TO 6 FAMILIES, ALTERATIONS OBSERVED AT CELLAR LEVEL REAR ROOM OCCUPIED AS SRO WITH KEY LOCK ON DO

Cited provision(s): 1E8 — 28-210.1 CONVERT/MAINTAIN/OCCUPY MULT DWELLING W/3 OR MORE UNITS THAN APPROVED; 172 — 28-202.1 ADDITIONAL DAILY PENALTY FOR CLASS 1 VIOLATION OF 28-210.1 OR 28-210.2

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39177182R

CLASS - 1 · Issued February 12, 2026; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT PERMIT; NOTED AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR 3-PIECE BATHROOM (TOILET, SINK, SHOWER), AND RESIDENTIAL SINK. AT FIRST FLOOR INSTALLED WATER AND WASTE LINES FOR 2-PIECE BATHROOM

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 9 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.