BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2028716

Bronx property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Failure to Maintain

BoroughBronx
BIN2028716
Block / Lot03926 / 0024
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200303R (source ECB number 39200303R). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39200299N
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $1,600.00 ATOI OBSERVED AT BASEMENT, UNAPPROVED, UNSAFE, UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES, AND/OR WIRING WERE OBSERVED IN USE. OPEN ELECTRICAL PANEL AND BOX WITH EXPOSED LIVE ELE 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39200302P
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 A/C UNITS THAT WERE UNSECURED DUE TO MISSING SUPPORT BRACKETS. THIS CONDITION CREATES A SERIOUS FALLING-OBJECT HAZARD, AS UNSECURED A/C UNITS COULD POTENTIALLY FALL AND STRIKE PEDESTRIANS, TENANTS, VISITORS, OR 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39200300L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 AT THE CELLAR AND BASEMENT, BOILER ROOM AND COORIDORS PIPING WAS OBSERVED PENETRATING FIRE-RATED CEILING AND WALLS. THE PENETRATIONS OPENING REMAIN , FIRE STOPPING NOT APPLIED ,SEAL ALL OPENINGS AT FIRE SEPERAT 239 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
39200303R
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 ATOI OBSERVED THAT THE BUILDING ENCLOSURE AT THE GAS METER LOCATION WAS NOT MAINTAINED IN ACCORDANCE WITH THE APPROVED PLAN FILED UNDER JOB NO. X00505305-P1, PAGE PL-003.00. THE APPROVED PLAN SHOWS AN ENCLOSED 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39200301N
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 ATOI, AT THE REAR OF THE PROPERTY, OBSERVED AN APPROXIMATELY 10-FOOT-HIGH BY 60 FT WIDE RETAINING WALL. THE WALL IS SHOWING CRACKS IN SEVERAL AREAS, WITH SOME STONES BECOMING LOOSE. THE WALL ALSO EXHIBITS SIGNS 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Failure to Maintain summonses; Electrical Work / Electrical Permit; Boiler / HVAC / Service Equipment. The hearing date is October 16, 2026; the source issue date(s) are August 12, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39200299N

CLASS - 1 · Issued August 12, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED AT BASEMENT, UNAPPROVED, UNSAFE, UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES, AND/OR WIRING WERE OBSERVED IN USE. OPEN ELECTRICAL PANEL AND BOX WITH EXPOSED LIVE ELE

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Failure to Maintain — Summons 39200302P

CLASS - 2 · Issued August 12, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: A/C UNITS THAT WERE UNSECURED DUE TO MISSING SUPPORT BRACKETS. THIS CONDITION CREATES A SERIOUS FALLING-OBJECT HAZARD, AS UNSECURED A/C UNITS COULD POTENTIALLY FALL AND STRIKE PEDESTRIANS, TENANTS, VISITORS, OR

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Boiler / HVAC / Service Equipment — Summons 39200300L

CLASS - 2 · Issued August 12, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE CELLAR AND BASEMENT, BOILER ROOM AND COORIDORS PIPING WAS OBSERVED PENETRATING FIRE-RATED CEILING AND WALLS. THE PENETRATIONS OPENING REMAIN , FIRE STOPPING NOT APPLIED ,SEAL ALL OPENINGS AT FIRE SEPERAT

Cited provision(s): 239 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Failure to Maintain — Summons 39200303R

CLASS - 1 · Issued August 12, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI OBSERVED THAT THE BUILDING ENCLOSURE AT THE GAS METER LOCATION WAS NOT MAINTAINED IN ACCORDANCE WITH THE APPROVED PLAN FILED UNDER JOB NO. X00505305-P1, PAGE PL-003.00. THE APPROVED PLAN SHOWS AN ENCLOSED

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Failure to Maintain — Summons 39200301N

CLASS - 2 · Issued August 12, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, AT THE REAR OF THE PROPERTY, OBSERVED AN APPROXIMATELY 10-FOOT-HIGH BY 60 FT WIDE RETAINING WALL. THE WALL IS SHOWING CRACKS IN SEVERAL AREAS, WITH SOME STONES BECOMING LOOSE. THE WALL ALSO EXHIBITS SIGNS

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.