BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2041973

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 2, 2026, October 7, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2041973
Block / Lot03988 / 0055
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039188727L (source ECB number 39188727L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35724233M
ACTIVE
October 2, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORDS. ILLEGALLY CREATED, CLASS "A" APARTMENT AT CELLAR, WITH FULL BATHROOM AND KITCHEN: CONSISTED OF GAS STOVE 1 FAMILY PRIVATE DWEL 203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39188727L
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 OCCUPANCY CONTRARY IN THE BASEMENT OF SET LOCATION 1 FAMILY DWELLING. AS PER DOB RECORD C OF O # CO 15023-54 INDICATES BOILER, STORAGE AND 1 CAR GARAGE. OBSERVED BASEMENT WAS CONVERTED INTO 1 BDR APARTMENT WITH 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
39188728N
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 FAILURE TO MAINTAIN, OBSERVED COMBUSTIBLE ITEMS STORED NEAR THE BOILER. STAIRWELL CONNECTING BASEMENT TO 1ST FLOOR OBSTRUCTED BY EXCESSIVE AMOUNT BOXES AND HOUSEHOLD ITEMS., REPAIR AND/REPLACE 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39188729P
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED WORK W/O PERMIT FOR FULL PARTITION WALL ERECTED IN BASEMENT TO CREATE A 3PC BATHROOM AND BEDROOM FOR ILLEGAL LIVING QUARTERS. NO PERMITS FOUND IN DOB RECORDS ISSUED FOR WORK., OBTAIN ALL PERMITS 201 — 28-105.1 WORK WITHOUT A PERMIT
39188730M
ACTIVE
October 7, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK W/O PERMIT FOR PLUMBING INSTALLATION. OBSERVED IN BASEMENT OWNER INSTALLED 3PC BATHROOM AND ILLEGAL GAS LINE FOR STOVE. 1ST FLOOR HAS A 1PC BATHROOM TOWARDS THE REAR. NO PERMITS FOUND IN DOB RECORDS., OBTA 101 — 28-105.1 WORK WITHOUT A PERMIT
39188731Y
ACTIVE
October 7, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 WORK W/O PERMIT FOR ELECTRICAL WIRING. OBSERVED IN BASEMENT FL INSTALLATION OF WALL OUTLETS, LIGHTS AND SWITCHES THROUGHOUT THE APARTMENT. NO ISSUED PERMITS FOUND IN DOB RECORDS FOR WORK., OBTAIN PERMIT 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; 2 Illegal Occupancy / Conversion summonses; Boiler / HVAC / Service Equipment. The hearing dates are October 2, 2026, October 7, 2026; the source issue date(s) are March 30, 2026, May 14, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Illegal Occupancy / Conversion — Summons 35724233M

CLASS - 2 · Issued March 30, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORDS. ILLEGALLY CREATED, CLASS "A" APARTMENT AT CELLAR, WITH FULL BATHROOM AND KITCHEN: CONSISTED OF GAS STOVE 1 FAMILY PRIVATE DWEL

Cited provision(s): 203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Illegal Occupancy / Conversion — Summons 39188727L

CLASS - 1 · Issued May 14, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY IN THE BASEMENT OF SET LOCATION 1 FAMILY DWELLING. AS PER DOB RECORD C OF O # CO 15023-54 INDICATES BOILER, STORAGE AND 1 CAR GARAGE. OBSERVED BASEMENT WAS CONVERTED INTO 1 BDR APARTMENT WITH

Cited provision(s): 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Boiler / HVAC / Service Equipment — Summons 39188728N

CLASS - 1 · Issued May 14, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO MAINTAIN, OBSERVED COMBUSTIBLE ITEMS STORED NEAR THE BOILER. STAIRWELL CONNECTING BASEMENT TO 1ST FLOOR OBSTRUCTED BY EXCESSIVE AMOUNT BOXES AND HOUSEHOLD ITEMS., REPAIR AND/REPLACE

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.

Hearing issues to verify

  • Was the cited device in service at the time alleged?
  • Was the equipment already repaired, disconnected or removed?
  • Do required annual inspection / filing records show compliance for the relevant cycle?

Evidence that may matter

  • Licensed contractor maintenance/repair records
  • Inspection and testing results
  • Device-status or annual filing records
  • Utility/CO testing records and photographs where relevant

Work Without a Permit — Summons 39188729P

CLASS - 2 · Issued May 14, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED WORK W/O PERMIT FOR FULL PARTITION WALL ERECTED IN BASEMENT TO CREATE A 3PC BATHROOM AND BEDROOM FOR ILLEGAL LIVING QUARTERS. NO PERMITS FOUND IN DOB RECORDS ISSUED FOR WORK., OBTAIN ALL PERMITS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39188730M

CLASS - 1 · Issued May 14, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK W/O PERMIT FOR PLUMBING INSTALLATION. OBSERVED IN BASEMENT OWNER INSTALLED 3PC BATHROOM AND ILLEGAL GAS LINE FOR STOVE. 1ST FLOOR HAS A 1PC BATHROOM TOWARDS THE REAR. NO PERMITS FOUND IN DOB RECORDS., OBTA

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39188731Y

CLASS - 2 · Issued May 14, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK W/O PERMIT FOR ELECTRICAL WIRING. OBSERVED IN BASEMENT FL INSTALLATION OF WALL OUTLETS, LIGHTS AND SWITCHES THROUGHOUT THE APARTMENT. NO ISSUED PERMITS FOUND IN DOB RECORDS FOR WORK., OBTAIN PERMIT

Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.