October 2026 NYC DOB / OATH Hearing — BIN 2045229

Bronx property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBronx
BIN2045229
Block / Lot04116 / 0008
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035730857L (source ECB number 35730857L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35730856J
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $2,400.00 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE /INADEQUATE SHED CONDITIONS I.E. LOOSE PARAPET PANEL ON THE CORNER OF EXPOSURE 2 AND EXPOSURE 3 AND 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
35730857L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTED AT THETIME OF INSPECTION I OBSERVED THAT THE PERMIT FOR CONSTRUCTION FENCE HAS EXPIRED. I CHECKED ON THE SITE AND FOUND NO PERMIT DISPLAYED. I THE 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Sidewalk Shed / Scaffold; Construction Fence. The hearing date is October 16, 2026; the source issue date(s) are August 7, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Sidewalk Shed / Scaffold — Summons 35730856J

CLASS - 2 · Issued August 7, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTED AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE /INADEQUATE SHED CONDITIONS I.E. LOOSE PARAPET PANEL ON THE CORNER OF EXPOSURE 2 AND EXPOSURE 3 AND

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Construction Fence — Summons 35730857L

CLASS - 2 · Issued August 7, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTED AT THETIME OF INSPECTION I OBSERVED THAT THE PERMIT FOR CONSTRUCTION FENCE HAS EXPIRED. I CHECKED ON THE SITE AND FOUND NO PERMIT DISPLAYED. I THE

Cited provision(s): 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

How this type of condition is typically resolved

Construction-fence charges generally require bringing the fence, gates, viewing panels, height and site protection into compliance with the approved construction-safety setup and maintaining it for the required duration.

Hearing issues to verify

  • Did the fence configuration on the inspection date match the approved/logistics plan?
  • Was the cited opening or defect temporary and promptly corrected?
  • Was a permit or construction-fence filing active where required?

Evidence that may matter

  • Approved construction-fence/site logistics documents
  • Dated photographs
  • Contractor logs and correction invoice
  • Permit/filing record

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.