BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2046052

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBronx
BIN2046052
Block / Lot04168 / 0005
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557764L (source ECB number 39557764L). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557763J
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, ACTIVE JOBSITE I OBSERVED INADEQUATE INFILL FOR STAIR WAY STEPS. THIS SITUATION, CREATES A TRIP AND FALL HAZARD FOR WORKERS AND FIRST RESPONDERS INC 2P7
39557769K
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $5,000.00 AT THE TIME OF INSPECTION, ACTIVE SITE I OBSERVED AT EXP#2 REAR YARD ADJACENT PROPERTY NO OVERHEAD PROTECTION PROVIDED AS PER PLAN, ALSO OBSERVED THAT THERE WERE NO CONTROL ACCESS ZONE ESTABLISHED OR SAFETY MEA 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557764L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 AT THE TIME OF INSPECTION OF A 4-STORY NEW PROPOSED BUILDING, ACTIVE SITE I OBSERVED AT EXPOSURE#2 ADJACENT PROPERTY WITHIN 20FT OF THE JOBSITE AND NO PROTECTION PROVIDED AS PER BY CODE 3309.14 PROTECTION OF WI 2P7
39557762H
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION OF A 4-STORY NB, ACTIVE SITE I OBSERVED AT EXP #1 THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3. THE BARRIERS WERE NOT PROPERLY FILLED WITH WATER OR S 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
39557766P
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $2,500.00 AT TIME OF INSPECTION, CS LIC.#029486 WAS DESIGNATED UNDER PERMIT X01333046-I1-SE AT 3013 MIDDLETOWN RD WHILE ALSO DESIGNATED AS SSC LIC.#3033 AT 2 WADE SQ. LOGBOOKS CONFIRM SIGN-IN AT BOTH OVERSEEING TWO SEPAR 2P7
39557767R
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF INSPECTION, WORKERS WERE EXPOSED TO AN UNPROTECTED LEADING EDGE ALONG THE ELEVATED WORK SURFACE. NO GUARDRAIL SYSTEM WAS INSTALLED ALONG THE OPEN PERIMETER TO PREVENT WORKERS FROM FALLING TO THE 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Other Building / Code Compliance summonses; 2 Site Safety / Safeguarding summonses. The hearing date is October 16, 2026; the source issue date(s) are August 11, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Other Building / Code Compliance — Summons 39557763J

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, ACTIVE JOBSITE I OBSERVED INADEQUATE INFILL FOR STAIR WAY STEPS. THIS SITUATION, CREATES A TRIP AND FALL HAZARD FOR WORKERS AND FIRST RESPONDERS INC

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Site Safety / Safeguarding — Summons 39557769K

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, ACTIVE SITE I OBSERVED AT EXP#2 REAR YARD ADJACENT PROPERTY NO OVERHEAD PROTECTION PROVIDED AS PER PLAN, ALSO OBSERVED THAT THERE WERE NO CONTROL ACCESS ZONE ESTABLISHED OR SAFETY MEA

Cited provision(s): 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39557764L

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY NEW PROPOSED BUILDING, ACTIVE SITE I OBSERVED AT EXPOSURE#2 ADJACENT PROPERTY WITHIN 20FT OF THE JOBSITE AND NO PROTECTION PROVIDED AS PER BY CODE 3309.14 PROTECTION OF WI

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557762H

CLASS - 1 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY NB, ACTIVE SITE I OBSERVED AT EXP #1 THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3. THE BARRIERS WERE NOT PROPERLY FILLED WITH WATER OR S

Cited provision(s): 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557766P

CLASS - 2 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, CS LIC.#029486 WAS DESIGNATED UNDER PERMIT X01333046-I1-SE AT 3013 MIDDLETOWN RD WHILE ALSO DESIGNATED AS SSC LIC.#3033 AT 2 WADE SQ. LOGBOOKS CONFIRM SIGN-IN AT BOTH OVERSEEING TWO SEPAR

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Site Safety / Safeguarding — Summons 39557767R

CLASS - 1 · Issued August 11, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, WORKERS WERE EXPOSED TO AN UNPROTECTED LEADING EDGE ALONG THE ELEVATED WORK SURFACE. NO GUARDRAIL SYSTEM WAS INSTALLED ALONG THE OPEN PERIMETER TO PREVENT WORKERS FROM FALLING TO THE

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.