What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; Other Building / Code Compliance. The hearing date is October 16, 2026; the source issue date(s) are August 6, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Work Without a Permit — Summons 39199595M
CLASS - 1 · Issued August 6, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: 2 HVACB UNITS AT EXPO 3 ON A MAKESHIFT SHED WITH ELECTRICAL POWER AND SWITCHING SUPPLIED TO EXTERIOR, ALSO OBSERVE LIGHTS, OUTLETS AND SWITCHES INSTALL THROUGHOUT THE STRUCTURE WITHOUT ANY PERMITS ON FILE FOR T
Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Other Building / Code Compliance — Summons 39199596Y
CLASS - 1 · Issued August 6, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, UNSAFE STORAGE OF COMBUSTIBLE MATERIALS AND EQUIPMENT WAS OBSERVED IN THE REAR YARD OF THE PROPERTY. IN PARTICULAR, 9 FULL PROPANE TANKS WERE NOTED ON THE GROUND NEXT TO A WOODEN STRU
Cited provision(s): 183 — BC 3303.4.6 & 27-1018 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Work Without a Permit — Summons 39199597X
CLASS - 1 · Issued August 6, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, A MAKESHIFT SHED STRUCTURE WAS OBSERVED IN THE REAR YARD OF THE PROPERTY. THE STRUCTURE APPEARS TO HAVE BEEN CONSTRUCTED USING 4X4 POSTS AND 2X4 FRAMING WITH 2X10 BOARDS,PLYWOOD FOR S
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.