What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Other Building / Code Compliance summonses; Work Without a Permit; Sidewalk Shed / Scaffold. The hearing date is October 30, 2026; the source issue date(s) are August 21, 2026, August 26, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Other Building / Code Compliance — Summons 39558210Y
CLASS - 2 · Issued August 21, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, I OBSERVED ON STREET. HEAVY DUTY MACHINERY WAS FOUND STORED ON THE STREET IN VIOLATION OF BC 3303.4.8 NO PROTECTIVE BARRIERS, WARNING SIGNAGE, OR HIGH-VISIBILITY MARKINGS WERE PROVIDE
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 39558213J
CLASS - 2 · Issued August 21, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, I OBSERVED A CONCRETE PUMP TRUCK OCCUPYING AND OBSTRUCTING THE SIDEWALK AT EXP#1, WITH CONSTRUCTION BARRIERS ENCLOSING THE WORK AREA AND RESTRICTING PEDESTRIAN PASSAGE. UPON REQUESTIN
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 39558211X
CLASS - 2 · Issued August 21, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, I OBSERVED ACTIVE CONCRETE POURING OPERATION FOR THE 3RD FLOOR SLAB, I NOTICED WASHING CEMENT WATER RUNNING INTO SEWER LINE ADJACENT TO JOBSITE AND ROADWAY, CONTRARY TO BC 3303.5.3 &
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Work Without a Permit — Summons 39558214L
CLASS - 1 · Issued August 21, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, I OBSERVED CONCRETE PUMP TRUCK AND CEMENT TRUCK AT EXPOSURE#1 WITH NO BARRICADES OR 4FT MESH FENCE PROVIDED AROUND AND ADJACENT TO SIDEWALK SHED AS PER CODE 3307.4.7 ALSO REVIEW THE S
Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Other Building / Code Compliance — Summons 39558212H
CLASS - 2 · Issued August 21, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT THE TIME OF INSPECTION, CONCRETE PLACEMENT OPERATIONS WERE IN PROGRESS AT THE 3RD-FLOOR SLAB. NO PRE-MANUFACTURED, WATERTIGHT CONCRETE WASHOUT CONTAINER WAS PROVIDED ON SITE FOR THE COLLECTION AND CONTAINMEN
Cited provision(s): 2P7
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Sidewalk Shed / Scaffold — Summons 39558426N
CLASS - 2 · Issued August 26, 2026; hearing October 30, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION OF A 6-STORY PROPOSED NB, ACTIVE SITE I OBSERVED WORKERS USING SUPPORTED PIPE SCAFFOLDING FOR MASONRY BRICK WORK, PIPE SCAFFOLD MISSING GUARDRAILS, MISSING TOE BROAD, MISSING DEBRIS NETTIN
Cited provision(s): 2P7
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records
Case-specific next step
For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review