BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2061536

Bronx property record with 6 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2061536
Block / Lot04753 / 0070
October Records6
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039200700K (source ECB number 39200700K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39200700K
ACTIVE
October 30, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. I OBSERVED A GAS LINE, 3 PIECE BATHROOM, KITCHEN SINK, WATER AND WASTE LINES INSTALLED IN AN ILLEGAL BASEMENT APARTMENT. NO PLUMBING PERMIT ON FILE, OBTAIN PERMIT; OBTAIN PLUMBING PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39200930X
ACTIVE
October 30, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 WORK WITHOUT A PERMIT. I OBSERVED A TOILET, PEDESTRAL SINK AND A SHOWER STALL INSTALLED IN THE LEGAL GARAGE. NO PLUMBING PERMIT ON FILE., OBTAIN ALL PERMITS; OBTAIN PLUMBING PERMIT. SUBMIT THE CERTIFICATE OF CO 201 — 28-105.1 WORK WITHOUT A PERMIT
39200696R
ACTIVE
October 30, 2026
8:30 AM
CLASS - 2 PENDING $2,500.00 RESIDENCE CONVERTED. I OBSERVED THE FIRST ON GROUND RECREATION ROOM TURNED INTO A 1BDRM CLASS A APARTMENT. C OF O #50327 SAYS FIRST ON GRND: RECREATION ROOM, LAUNDRY STORAGE ROOM, ONE CAR GARAGE, BOILER ROOM. P 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN
39200701M
ACTIVE
October 30, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. I OBSERVED ELECTRICAL OUTLETS, SWITCHES, CEILING LOGHTS INSTALLED INSIDE AN ILLEGAL BASEMENT APARTMENT. NO ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39200698K
ACTIVE
October 30, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 WORK WITHOUT A PERMIT. I OBSERVED FULL HEIGHT PARTITIONS, DOOR FRAMES AND DOORS INSTALLED INSIDE THE GROUND FLOOR ILLEGAL BASEMENT APARTMENT. NO PERMIT ON FILE., OBTAIN PERMIT; OBTAIN PERMIT 101 — 28-105.1 WORK WITHOUT A PERMIT
39200937Z
ACTIVE
October 30, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 OCCUPANCY CONTRARY. I OBSERVED THE OWNER OCCUPIED 2ND FLOOR APARTMENT HAS ILLEGALLY CONVERTED A BEDROOM INTO A SRO. EVIDENCE OF A MICROWAVE, HOTPLATE, FRIDGE AND A KEYED LOCK DOOR., DISCONTINUE ILLEGAL OCCUPANC 203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 6 summons records for this property identifier. The charge mix is: 4 Work Without a Permit summonses; 2 Illegal Occupancy / Conversion summonses. The hearing date is October 30, 2026; the source issue date(s) are August 14, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39200700K

CLASS - 1 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. I OBSERVED A GAS LINE, 3 PIECE BATHROOM, KITCHEN SINK, WATER AND WASTE LINES INSTALLED IN AN ILLEGAL BASEMENT APARTMENT. NO PLUMBING PERMIT ON FILE, OBTAIN PERMIT; OBTAIN PLUMBING PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39200930X

CLASS - 2 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. I OBSERVED A TOILET, PEDESTRAL SINK AND A SHOWER STALL INSTALLED IN THE LEGAL GARAGE. NO PLUMBING PERMIT ON FILE., OBTAIN ALL PERMITS; OBTAIN PLUMBING PERMIT. SUBMIT THE CERTIFICATE OF CO

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39200696R

CLASS - 2 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: RESIDENCE CONVERTED. I OBSERVED THE FIRST ON GROUND RECREATION ROOM TURNED INTO A 1BDRM CLASS A APARTMENT. C OF O #50327 SAYS FIRST ON GRND: RECREATION ROOM, LAUNDRY STORAGE ROOM, ONE CAR GARAGE, BOILER ROOM. P

Cited provision(s): 2K6 — 28-210.1 RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Work Without a Permit — Summons 39200701M

CLASS - 1 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. I OBSERVED ELECTRICAL OUTLETS, SWITCHES, CEILING LOGHTS INSTALLED INSIDE AN ILLEGAL BASEMENT APARTMENT. NO ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39200698K

CLASS - 1 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORK WITHOUT A PERMIT. I OBSERVED FULL HEIGHT PARTITIONS, DOOR FRAMES AND DOORS INSTALLED INSIDE THE GROUND FLOOR ILLEGAL BASEMENT APARTMENT. NO PERMIT ON FILE., OBTAIN PERMIT; OBTAIN PERMIT

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Illegal Occupancy / Conversion — Summons 39200937Z

CLASS - 2 · Issued August 14, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OCCUPANCY CONTRARY. I OBSERVED THE OWNER OCCUPIED 2ND FLOOR APARTMENT HAS ILLEGALLY CONVERTED A BEDROOM INTO A SRO. EVIDENCE OF A MICROWAVE, HOTPLATE, FRIDGE AND A KEYED LOCK DOOR., DISCONTINUE ILLEGAL OCCUPANC

Cited provision(s): 203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

How this type of condition is typically resolved

The key question is whether the observed occupancy or layout matches the lawful use of the premises. Resolution may require restoring the prior lawful layout/use or, when legally feasible, filing plans and obtaining approvals to legalize the condition.

Hearing issues to verify

  • What use and number of dwelling/occupancy units are shown by the Certificate of Occupancy, Schedule of Occupancy or other lawful-use records?
  • Did the inspector accurately identify how the space was being used on the cited date?
  • Was the cited space actually occupied as alleged, or were the observed beds, kitchens, locks or partitions consistent with another lawful use?
  • Is there an approved filing or historical record supporting the present use?

Evidence that may matter

  • Certificate of Occupancy / Schedule of Occupancy and approved plans
  • Historic occupancy records, permits and prior approved layouts
  • Dated photographs and floor plans
  • Leases, tenant records or sworn statements concerning actual use
  • Permits/inspection records if the condition was legalized or restored

Case-specific next step

For this property, the first paid review should reconcile the 6 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.