October 2026 NYC DOB / OATH Hearing — BIN 2095967

Bronx property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughBronx
BIN2095967
Block / Lot05517 / 0101
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039199224N (source ECB number 39199224N). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39199219Z
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION, A WATER HEATER INSTALLATION IN A SHED AT THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE WORK APPEARS TO HAVE INVOLVED PLUMBING CONNECTIONS TO INSTALL THE WATE 101 — 28-105.1 WORK WITHOUT A PERMIT
39199243Z
ACTIVE
October 16, 2026
10:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS OBSERVED PILED IN THE REAR YARD OF THE PROPERTY. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE RISK, AS THE DEBRIS MATERIALS ARE C 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39199224N
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF INSPECTION, ELECTRICAL WORK INSIDE A SHED IN THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE INSTALLATION APPEARS TO INCLUDE BX CONDUITS CONNECTING TO LIGHT SWITCHES, OUTL 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
39199230J
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $1,600.00 AT THE TIME OF INSPECTION, UNSAFE CONDITIONS WERE OBSERVED THROUGHOUT THE REAR-YARD SHED DUE TO EXPOSED ELECTRICAL WIRING ACROSS THE INTERIOR. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE, AS THE SHED IS 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39199266L
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF INSPECTION, A MAKESHIFT SHED IN THE REAR YARD WAS FOUND TO BE INSTALLED WITHOUT A PERMIT. THE STRUCTURE APPEARS TO BE 80% COMPLETED DUE TO THE SIDE OF THE SHED MISSING , CONSTRUCTED USING 4X4 POS 201 — 28-105.1 WORK WITHOUT A PERMIT

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Failure to Maintain; Electrical Work / Electrical Permit. The hearing date is October 16, 2026; the source issue date(s) are August 5, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Work Without a Permit — Summons 39199219Z

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, A WATER HEATER INSTALLATION IN A SHED AT THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE WORK APPEARS TO HAVE INVOLVED PLUMBING CONNECTIONS TO INSTALL THE WATE

Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Failure to Maintain — Summons 39199243Z

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS OBSERVED PILED IN THE REAR YARD OF THE PROPERTY. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE RISK, AS THE DEBRIS MATERIALS ARE C

Cited provision(s): 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Work Without a Permit — Summons 39199224N

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, ELECTRICAL WORK INSIDE A SHED IN THE REAR YARD WAS OBSERVED TO HAVE BEEN COMPLETED WITHOUT A PERMIT. THE INSTALLATION APPEARS TO INCLUDE BX CONDUITS CONNECTING TO LIGHT SWITCHES, OUTL

Cited provision(s): 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Electrical Work / Electrical Permit — Summons 39199230J

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, UNSAFE CONDITIONS WERE OBSERVED THROUGHOUT THE REAR-YARD SHED DUE TO EXPOSED ELECTRICAL WIRING ACROSS THE INTERIOR. THIS CONDITION RAISES CONCERNS FOR A POTENTIAL FIRE, AS THE SHED IS

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Work Without a Permit — Summons 39199266L

CLASS - 2 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION, A MAKESHIFT SHED IN THE REAR YARD WAS FOUND TO BE INSTALLED WITHOUT A PERMIT. THE STRUCTURE APPEARS TO BE 80% COMPLETED DUE TO THE SIDE OF THE SHED MISSING , CONSTRUCTED USING 4X4 POS

Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.