October 2026 NYC DOB / OATH Hearing — BIN 2096173

Bronx property record with 5 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Plumbing / Gas

BoroughBronx
BIN2096173
Block / Lot02624 / 0002
October Records5
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557287H (source ECB number 39557287H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557287H
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 AT TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, I OBSERVED WORKERS PERFORMING PLUMBING OPERATION CLOSE TO UNCAPPED REBAR MULTIPLE LOCATION THROUGHOUT INSIDE OF THE SITE, CREATING A HAZARDOUS CONDITION 2P7
39199400N
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 ATOI, OBSERVE SIGNIFICANT CRACKS ON THE STAIRCASE AT THE REAR YARD INSIDE 634 EAGLE AVENUE BX PROPERTY DUE TO THE ONGOING CONSTRUCTION NEXT DOOR AT 632 EAGLE AVENUE BX LOCATION, REPAIR AND/OR REPLACE 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
39557285Y
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 AT INSPECTION OF THE ACTIVE 4-STORY BUILDING SITE, EXPOSURE #2 WAS OBSERVED ALONG THE FENCE AT 634 EAGLE AVE. THE TEMPORARY FENCE WAS NOT PROPERLY SECURED AS PER PLAN. SECTIONS WERE LEANING TOWARD THE ADJACENT 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557289L
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, I OBSERVED OFFICE BOOT AND PORTER POTTY STORED IN ROADWAY EXPOSURE #1. UPON REVIEW THE APPROVED ENGINEER SITE SAFETY PLAN OFFICE BOOT AND PORTER POT 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
39557286X
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NB, ACTIVE SITE I OBSERVED AT EXP #1 THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3. THE BARRIERS WERE NOT PROPERLY FILLED WITH W 2F6 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 5 summons records for this property identifier. The charge mix is: Plumbing / Gas; Failure to Maintain; Sidewalk Shed / Scaffold; Work Without a Permit; Other Building / Code Compliance. The hearing date is October 16, 2026; the source issue date(s) are August 6, 2026, July 30, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Plumbing / Gas — Summons 39557287H

CLASS - 2 · Issued July 30, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, I OBSERVED WORKERS PERFORMING PLUMBING OPERATION CLOSE TO UNCAPPED REBAR MULTIPLE LOCATION THROUGHOUT INSIDE OF THE SITE, CREATING A HAZARDOUS CONDITION

Cited provision(s): 2P7

How this type of condition is typically resolved

Plumbing/gas matters typically require determining whether the work was permitted and performed by the required licensed trade, correcting unsafe or unapproved conditions, and completing inspections/sign-off.

Hearing issues to verify

  • Was there a valid plumbing/gas filing covering the cited scope?
  • Did the condition predate the respondent's work or ownership?
  • Was the cited installation already disconnected or corrected?

Evidence that may matter

  • Licensed Master Plumber permit / filing records
  • Pressure-test / inspection / utility records
  • Invoices and plumber statements
  • Photographs showing the installation and correction

Failure to Maintain — Summons 39199400N

CLASS - 2 · Issued August 6, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ATOI, OBSERVE SIGNIFICANT CRACKS ON THE STAIRCASE AT THE REAR YARD INSIDE 634 EAGLE AVENUE BX PROPERTY DUE TO THE ONGOING CONSTRUCTION NEXT DOOR AT 632 EAGLE AVENUE BX LOCATION, REPAIR AND/OR REPLACE

Cited provision(s): 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

How this type of condition is typically resolved

Failure-to-maintain charges are fact-specific. The owner should identify the exact building component or service equipment cited, repair the condition, and document the repair with evidence tied to the inspection location/date.

Hearing issues to verify

  • Does the description accurately identify the component, location and condition?
  • Was the condition already repaired or not present when the summons was issued?
  • Was another party responsible for maintenance under facts that are legally relevant to the respondent's liability?

Evidence that may matter

  • Dated before/after photographs
  • Repair invoices and contractor statements
  • Professional inspection/report when structural or technical conditions are involved
  • Maintenance logs and prior inspection records

Sidewalk Shed / Scaffold — Summons 39557285Y

CLASS - 2 · Issued July 30, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT INSPECTION OF THE ACTIVE 4-STORY BUILDING SITE, EXPOSURE #2 WAS OBSERVED ALONG THE FENCE AT 634 EAGLE AVE. THE TEMPORARY FENCE WAS NOT PROPERLY SECURED AS PER PLAN. SECTIONS WERE LEANING TOWARD THE ADJACENT

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Work Without a Permit — Summons 39557289L

CLASS - 2 · Issued July 30, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NEW BUILDING, I OBSERVED OFFICE BOOT AND PORTER POTTY STORED IN ROADWAY EXPOSURE #1. UPON REVIEW THE APPROVED ENGINEER SITE SAFETY PLAN OFFICE BOOT AND PORTER POT

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Other Building / Code Compliance — Summons 39557286X

CLASS - 2 · Issued July 30, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 4-STORY PROPOSED NB, ACTIVE SITE I OBSERVED AT EXP #1 THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3. THE BARRIERS WERE NOT PROPERLY FILLED WITH W

Cited provision(s): 2F6 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 5 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.