Demolition — Summons 39535359K
DOB allegation in the source extract: ON-SITE FOR DEMO SIGN-OFF APPOINTMENT OF A ONE-STORY DETACHED GARAGE. GARAGE IS FULLY DEMOLISHED. UPON RESEARCH THROUGH DOB NOW SYSTEM, NOTIFICATION WAS NOT PROVIDED BY THE PERMIT HOLDER BETWEEN 24-48 HOURS TO
Cited provision(s): 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records