What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Work Without a Permit summonses; Boiler / HVAC / Service Equipment. The hearing date is October 16, 2026; the source issue date(s) are August 10, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Boiler / HVAC / Service Equipment — Summons 39199944L
CLASS - 1 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: AT TIME OF INSPECTION - OPENINGS OBSERVED THROUGHOUT BOILER RM CEILING, CREATING A FIRE HAZARD CONDITION., PR
Cited provision(s): 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN
How this type of condition is typically resolved
Service-equipment charges usually require repair, safe shutdown or replacement of the cited equipment, together with any required inspection, testing, annual filing or device-status update.
Hearing issues to verify
- Was the cited device in service at the time alleged?
- Was the equipment already repaired, disconnected or removed?
- Do required annual inspection / filing records show compliance for the relevant cycle?
Evidence that may matter
- Licensed contractor maintenance/repair records
- Inspection and testing results
- Device-status or annual filing records
- Utility/CO testing records and photographs where relevant
Work Without a Permit — Summons 39199942H
CLASS - 2 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR - FULL HEIGHT PARTITION WALLS ERECTED AT VARIOUS LOCATIONS TO CREATE A BTHRM & CLOSETS., OBTAIN ALL PERMITS
Cited provision(s): 201 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199945N
CLASS - 1 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR - WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM (TOILET, SINK, SHOWER); RESIDENTIAL SINK AT KITCHEN AREA. WATER & WASTE LINES & GAS LINE REMOVED FOR WASHER & DRYER AS INDICATED ON
Cited provision(s): 101 — 28-105.1 WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Work Without a Permit — Summons 39199943J
CLASS - 2 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: W/O A PERMIT. NOTED: AT CELLAR - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, OUTLETS, SWITCHES., OBTAIN PERMIT
Cited provision(s): 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
How this type of condition is typically resolved
The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.
Hearing issues to verify
- Did a valid permit already cover the exact work described by the inspector on the issue date?
- Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
- Do the approved drawings, permit scope and inspection history match the condition the inspector described?
- If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?
Evidence that may matter
- Permit and DOB NOW/BIS job records that predate the inspection
- Approved plans and amendments showing the cited work
- Dated photographs of the condition and construction stage
- Contracts, invoices and contractor statements establishing what work was actually performed
- Inspection / sign-off records if the work was subsequently legalized
Case-specific next step
For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.