What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Certificate of Correction / Commissioner Order; Site Safety / Safeguarding. The hearing dates are October 16, 2026, October 2, 2026; the source issue date(s) are August 10, 2026, July 9, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Certificate of Correction / Commissioner Order — Summons 39557091X
CLASS - 2 · Issued July 9, 2026; hearing October 2, 2026. · Hearing status: PENDING
DOB allegation in the source extract: DURING MY INSPECTION OF AN ACTIVE 12-STORY NB, AND AFTER REVIEWING A CLASS ONE VIOLATION ISSUED ON 05 15 2026.REF 39554181X: NO COMPLIANCE RECORDED, AND NO CERTIFICATE OF CORRECTION WAS MADE TO THE DEPARTMENT.
Cited provision(s): 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
How this type of condition is typically resolved
This charge focuses on failure to complete or document the DOB correction process for an earlier summons. The practical task is usually to identify the underlying summons, confirm that its physical condition was actually corrected, and complete the current DOB Certificate of Correction requirements with the supporting proof and any applicable civil-penalty documentation.
Hearing issues to verify
- Was a Certificate of Correction already submitted or approved for the underlying summons before this charge was issued?
- Does DOB's record identify the same underlying summons number and correction deadline described in this citation?
- Was the physical condition actually corrected, and can that correction be tied to the cited condition rather than a different job or location?
Evidence that may matter
- DOB NOW / AEU Certificate of Correction submission or approval record
- Before-and-after photographs tied to the cited condition
- Permits, inspection results, contractor receipts or professional statements supporting the correction
- Proof of applicable DOB civil-penalty payment or waiver, if required
Site Safety / Safeguarding — Summons 39557713L
CLASS - 2 · Issued August 10, 2026; hearing October 16, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT TIME OF INSPECTION, SITE SAFETY COORDINATOR LIC. NO. 003040 WAS DESIGNATED ON THE PW2 FOR TWO SEPARATE MAJOR BUILDING SITES: 112 EAST 167TH STREET, PERMIT NO. X01255412, AND 120 EAST 167TH STREET, PERMIT NO.
Cited provision(s): 2P7
How this type of condition is typically resolved
These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.
Hearing issues to verify
- What precise safety measure does the summons say was missing or inadequate?
- Was the condition temporary and corrected before or during the inspection?
- Did an approved site-safety plan or required site document address the cited condition?
Evidence that may matter
- Site Safety Plan / logistics drawings
- Daily safety logs and competent-person/site-safety records
- Photographs taken around the inspection time
- Contractor or safety-manager statements and correction records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.