October 2026 NYC DOB / OATH Hearing — BIN 2131151

Bronx property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 2, 2026, October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBronx
BIN2131151
Block / Lot02699 / 0054
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556821Y (source ECB number 39556821Y). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556821Y
ACTIVE
October 2, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION I OBSERVED DESIGNATED SITE SAFETY COORDINATOR #3483 WAS ALSO DESIGNATED CONSTRUCTION SUPER ON SEPARATE JOB SITE 666 E 170TH STREET. FAILURE TO COMPLY CREATES CONFLICTING SAFETY CONDITIONS 1P7
39557549Z
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 OBSERVED PROPOSED 7 STORY NB ACTIVE JOB SITE AT DECKING STAGE AT GROUND FLOOR. AT TIME OF INSPECTION I OBSERVED MULTIPLE UNCAPPED REBAR WHICH POSES IMPALEMENT HAZARDS. BC 3301.2PROVIDE/MAINTAIN SAFETY OF EXPOSE 2P7
39557548R
ACTIVE
October 16, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 OBSERVED PROPOSED 7 STORY NB ACTIVE JOB SITE AT DECKING STAGE AT GROUND FLOOR. AT TIME OF INSPECTION SITE FAILED TO PROVIDE APPROVED PLANS FOR SCOPE OF WORK AT TIME OF INSPECTION. 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 3 Site Safety / Safeguarding summonses. The hearing dates are October 16, 2026, October 2, 2026; the source issue date(s) are August 5, 2026, July 20, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39556821Y

CLASS - 1 · Issued July 20, 2026; hearing October 2, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION I OBSERVED DESIGNATED SITE SAFETY COORDINATOR #3483 WAS ALSO DESIGNATED CONSTRUCTION SUPER ON SEPARATE JOB SITE 666 E 170TH STREET. FAILURE TO COMPLY CREATES CONFLICTING SAFETY CONDITIONS

Cited provision(s): 1P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557549Z

CLASS - 2 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED PROPOSED 7 STORY NB ACTIVE JOB SITE AT DECKING STAGE AT GROUND FLOOR. AT TIME OF INSPECTION I OBSERVED MULTIPLE UNCAPPED REBAR WHICH POSES IMPALEMENT HAZARDS. BC 3301.2PROVIDE/MAINTAIN SAFETY OF EXPOSE

Cited provision(s): 2P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557548R

CLASS - 1 · Issued August 5, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED PROPOSED 7 STORY NB ACTIVE JOB SITE AT DECKING STAGE AT GROUND FLOOR. AT TIME OF INSPECTION SITE FAILED TO PROVIDE APPROVED PLANS FOR SCOPE OF WORK AT TIME OF INSPECTION.

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.