October 2026 NYC DOB / OATH Hearing — BIN 2131356

Bronx property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 9, 2026, October 16, 2026, October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Sidewalk Shed / Scaffold

BoroughBronx
BIN2131356
Block / Lot03314 / 0032
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039537438H (source ECB number 39537438H). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39537438H
ACTIVE
October 9, 2026
8:30 AM
CLASS - 2 PENDING $1,280.00 AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. AT EXP. 3 OBSERVED SEVERAL WORKERS AND MATERIALS SPREAD ON ENTIRE YARD NO EGRESS PATH. AT 8 FLOOR OBSERVED MATERIAL AND DEBRIS ALSO BLOCKING EGRESS PATH. ALSO DURI 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
39557271N
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF INSPECTION OF A 12-STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE EXPOSURE#1, I OBSERVED THE SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST RE 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
39558312P
ACTIVE
October 30, 2026
10:30 AM
CLASS - 2 PENDING $2,400.00 AT TIME OF INSPECTION 5:30 AM, OBSERVED DEFECTIVE LIGHTING AT SIDEWALK SHED EXPS.1 CREATING DARK CONDITION. HAZARDOUS TO TENANTS/PEDESTRIANS, RISK OF SLIP/TRIP/FALL AND CRIMINAL ACTIVITY. NO PREVENTIVE MEASURES 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Sidewalk Shed / Scaffold summonses; Egress / Exit Obstruction. The hearing dates are October 16, 2026, October 30, 2026, October 9, 2026; the source issue date(s) are August 25, 2026, February 27, 2025, July 30, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Egress / Exit Obstruction — Summons 39537438H

CLASS - 2 · Issued February 27, 2025; hearing October 9, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. AT EXP. 3 OBSERVED SEVERAL WORKERS AND MATERIALS SPREAD ON ENTIRE YARD NO EGRESS PATH. AT 8 FLOOR OBSERVED MATERIAL AND DEBRIS ALSO BLOCKING EGRESS PATH. ALSO DURI

Cited provision(s): 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

How this type of condition is typically resolved

Egress charges are generally corrected by removing the obstruction or restoring the required exit width/path and then documenting that the means of egress is clear and code compliant.

Hearing issues to verify

  • Was the cited passageway actually required egress for the affected occupancy?
  • Did the alleged obstruction exist when the inspector observed it?
  • Was the condition immediately removed and can the timing be documented?

Evidence that may matter

  • Dated photographs showing the exit path
  • Approved floor/egress plans
  • Building or security logs
  • Statements or work records documenting removal of stored items/obstructions

Sidewalk Shed / Scaffold — Summons 39557271N

CLASS - 2 · Issued July 30, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF INSPECTION OF A 12-STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE EXPOSURE#1, I OBSERVED THE SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST RE

Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sidewalk Shed / Scaffold — Summons 39558312P

CLASS - 2 · Issued August 25, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION 5:30 AM, OBSERVED DEFECTIVE LIGHTING AT SIDEWALK SHED EXPS.1 CREATING DARK CONDITION. HAZARDOUS TO TENANTS/PEDESTRIANS, RISK OF SLIP/TRIP/FALL AND CRIMINAL ACTIVITY. NO PREVENTIVE MEASURES

Cited provision(s): 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.