BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 2809523

Bronx property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 16, 2026, October 30, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBronx
BIN2809523
Block / Lot02867 / 0098
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 035729962P (source ECB number 35729962P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
35729962P
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 FAILURE TO INSTITUTE SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION "IMPROPER GUARDRAIL". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 3RD FLOOR LEVEL. OBS 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39201886M
ACTIVE
October 30, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 MOBILE CRANE CN#236/26 CD#5209 WAS ERECTED, BUT RESPONDENT FAILED TO NOTIFY THE DEPARTMENT OF ARRIVAL. ARIVAL NOTIFICATION WAS MADE AFTER I ARRIVED ON SITE., PROPERLY NOTIFY THE DEPARTMENT; MAKE PROPER NOTIFICA 2J9 — 1 RCNY 3319-01(C)(5) EQUIPMENT USER FAILED TO MAKE THE PROPER NOTIFICATION TO THE DEPARTMEN

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Crane / Hoist / Derricks. The hearing dates are October 16, 2026, October 30, 2026; the source issue date(s) are August 26, 2026, August 4, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 35729962P

CLASS - 1 · Issued August 4, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO INSTITUTE SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION "IMPROPER GUARDRAIL". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE 3RD FLOOR LEVEL. OBS

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Crane / Hoist / Derricks — Summons 39201886M

CLASS - 2 · Issued August 26, 2026; hearing October 30, 2026. · Hearing status: PENDING

DOB allegation in the source extract: MOBILE CRANE CN#236/26 CD#5209 WAS ERECTED, BUT RESPONDENT FAILED TO NOTIFY THE DEPARTMENT OF ARRIVAL. ARIVAL NOTIFICATION WAS MADE AFTER I ARRIVED ON SITE., PROPERLY NOTIFY THE DEPARTMENT; MAKE PROPER NOTIFICA

Cited provision(s): 2J9 — 1 RCNY 3319-01(C)(5) EQUIPMENT USER FAILED TO MAKE THE PROPER NOTIFICATION TO THE DEPARTMEN

How this type of condition is typically resolved

Crane/hoist matters are specialized safety and licensing cases. Resolution generally requires the correct equipment permit/notification, licensed operator/equipment records, inspections and compliance with site-specific lifting/safety requirements.

Hearing issues to verify

  • Did the cited equipment and activity require the permit/notification alleged?
  • Was the operator/equipment authorization current on the inspection date?
  • Do logs and inspection records contradict the unsafe condition described?

Evidence that may matter

  • Equipment permit / CD filing
  • Operator license and equipment certification
  • Inspection / maintenance / lift-plan records
  • Dated site photographs and safety logs

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.