October 2026 NYC DOB / OATH Hearing — BIN 2812414

Bronx property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 16, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBronx
BIN2812414
Block / Lot02802 / 0008
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557432P (source ECB number 39557432P). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557433R
ACTIVE
October 16, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 3301.7.2 MANUFACTURER SPECIFICATIONS- OBSERVED C-JOIST INSTALLED THROUGHOUT ENTIRE JOBSITE FRAMING. UPON REQUEST FOR THE MANUFACTURE SPECIFICATIONS FROM ONSITE PERSONNEL, NONE WERE PROVIDED AT TIME OF INSPECTIO 2P7
39557431N
ACTIVE
October 16, 2026
8:30 AM
CLASS - 2 PENDING $1,250.00 OBSERVED HYDRAULIC SWING HOIST INSTALLED ROOF LEVEL OF JOBSITE. UPON REQUEST FOR DESIGN DRAWINGS FROM ONSITE PERSONNEL, NONE WERE PROVIDED AT THE TIME OF INSPECTION. STOP ALL USE OF HYDRAULIC SWING HOISTPROVIDE 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39557434Z
ACTIVE
October 16, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 ON ACTIVE JOBSITE OBSERVED HYDRAULIC SWING HOIST INSTALLED AND C-HOOKS. THE ROOF AREA HAS NO ADEQUATE GUARD RAILS INSTALLED THROUGHOUT AROUND LEADING EDGES OF ALL EXPOSURES. STOP ALL WORK ROOF LEVEL OF JOBSITE 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
39557432P
ACTIVE
October 16, 2026
9:30 AM
CLASS - 2 PENDING $800.00 OBSERVED MANUAL C-HOOK SUSPENDED SCAFFOLDING INSTALLED ROOF LEVEL OF JOBSITE. REQUEST FOR NOTIFICATION FOR INSTALLATION WAS NOT PROVIDED AT TIME OF INSPECTION. UPON REVIEW OF DEPARTMENT RECORDS ONLY NOTIFICATIO 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: 3 Site Safety / Safeguarding summonses; Sidewalk Shed / Scaffold. The hearing date is October 16, 2026; the source issue date(s) are August 3, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39557433R

CLASS - 2 · Issued August 3, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: 3301.7.2 MANUFACTURER SPECIFICATIONS- OBSERVED C-JOIST INSTALLED THROUGHOUT ENTIRE JOBSITE FRAMING. UPON REQUEST FOR THE MANUFACTURE SPECIFICATIONS FROM ONSITE PERSONNEL, NONE WERE PROVIDED AT TIME OF INSPECTIO

Cited provision(s): 2P7

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557431N

CLASS - 2 · Issued August 3, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED HYDRAULIC SWING HOIST INSTALLED ROOF LEVEL OF JOBSITE. UPON REQUEST FOR DESIGN DRAWINGS FROM ONSITE PERSONNEL, NONE WERE PROVIDED AT THE TIME OF INSPECTION. STOP ALL USE OF HYDRAULIC SWING HOISTPROVIDE

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Site Safety / Safeguarding — Summons 39557434Z

CLASS - 1 · Issued August 3, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: ON ACTIVE JOBSITE OBSERVED HYDRAULIC SWING HOIST INSTALLED AND C-HOOKS. THE ROOF AREA HAS NO ADEQUATE GUARD RAILS INSTALLED THROUGHOUT AROUND LEADING EDGES OF ALL EXPOSURES. STOP ALL WORK ROOF LEVEL OF JOBSITE

Cited provision(s): 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Sidewalk Shed / Scaffold — Summons 39557432P

CLASS - 2 · Issued August 3, 2026; hearing October 16, 2026. · Hearing status: PENDING

DOB allegation in the source extract: OBSERVED MANUAL C-HOOK SUSPENDED SCAFFOLDING INSTALLED ROOF LEVEL OF JOBSITE. REQUEST FOR NOTIFICATION FOR INSTALLATION WAS NOT PROVIDED AT TIME OF INSPECTION. UPON REVIEW OF DEPARTMENT RECORDS ONLY NOTIFICATIO

Cited provision(s): 261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.