October 2026 NYC DOB / OATH Hearing — BIN 3000605

Brooklyn property record with 4 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing dates: October 7, 2026, October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Site Safety / Safeguarding

BoroughBrooklyn
BIN3000605
Block / Lot00175 / 0001
October Records4
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039556934K (source ECB number 39556934K). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39556934K
ACTIVE
October 7, 2026
10:30 AM
CLASS - 1 PENDING $10,000.00 AT TIME OF INSPECTION, MONOKOTE FIREPROOFING SPRAY OPERATIONS WERE CONDUCTED WITHOUT ADEQUATE CONTAINMENT. MONOKOTE DEBRIS ORIGINATING FROM THE SITE WAS OBSERVED AT 53 BOERUM PLACE. FAILURE TO CONTAIN AIRBORNE 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39555895M
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 WORKER CUT HAND WHILE USING REBAR BENDING MACHINE FOR REBAR OPERATION, ON A 17 STORY NB SITE. PERMIT HOLDER JOB# B00939362-I1-GC, FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS TO CODE 28-1 1M7
39557492R
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $10,000.00 AT TIME OF INSPECTION, WHILE RESPONDING TO AN INCIDENT INVOLVING A WORKER WHO SLIPPED AND FELL DURING STRIPPING OPERATIONS AT THE ELEVATOR SHAFT ON THE 14TH FLOOR, SCAFFOLD PLATFORMS WERE NOT FULLY PLANKED, NO 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
39557493Z
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $5,000.00 AT TIME OF INSPECTION, MAKESHIFT TEMPORARY PLATFORMS WERE OBSERVED ON STAIRCASES AT THE 17TH FLOOR. UPON REQUEST FOR DESIGN DRAWINGS, NONE WERE PROVIDED, CONTRARY TO BC 3301.6.5. STOP USE OF THE TEMPORARY PLATF 1P7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 4 summons records for this property identifier. The charge mix is: Site Safety / Safeguarding; Other Building / Code Compliance; Sidewalk Shed / Scaffold; Sign / Awning / Advertising. The hearing dates are October 14, 2026, October 7, 2026; the source issue date(s) are August 4, 2026, July 22, 2026, June 25, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39556934K

CLASS - 1 · Issued July 22, 2026; hearing October 7, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, MONOKOTE FIREPROOFING SPRAY OPERATIONS WERE CONDUCTED WITHOUT ADEQUATE CONTAINMENT. MONOKOTE DEBRIS ORIGINATING FROM THE SITE WAS OBSERVED AT 53 BOERUM PLACE. FAILURE TO CONTAIN AIRBORNE

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39555895M

CLASS - 1 · Issued June 25, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: WORKER CUT HAND WHILE USING REBAR BENDING MACHINE FOR REBAR OPERATION, ON A 17 STORY NB SITE. PERMIT HOLDER JOB# B00939362-I1-GC, FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS TO CODE 28-1

Cited provision(s): 1M7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39557492R

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, WHILE RESPONDING TO AN INCIDENT INVOLVING A WORKER WHO SLIPPED AND FELL DURING STRIPPING OPERATIONS AT THE ELEVATOR SHAFT ON THE 14TH FLOOR, SCAFFOLD PLATFORMS WERE NOT FULLY PLANKED, NO

Cited provision(s): 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Sign / Awning / Advertising — Summons 39557493Z

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT TIME OF INSPECTION, MAKESHIFT TEMPORARY PLATFORMS WERE OBSERVED ON STAIRCASES AT THE 17TH FLOOR. UPON REQUEST FOR DESIGN DRAWINGS, NONE WERE PROVIDED, CONTRARY TO BC 3301.6.5. STOP USE OF THE TEMPORARY PLATF

Cited provision(s): 1P7

How this type of condition is typically resolved

Sign-related charges usually require confirming zoning/permit requirements, dimensions, illumination and placement, followed by permit/legalization or removal/modification.

Hearing issues to verify

  • Was the sign/awning exempt from a permit or already covered by an approved filing?
  • Were the dimensions/location described by the inspector accurate?
  • Was the sign removed or modified before the summons date or hearing?

Evidence that may matter

  • Sign permit / zoning documents
  • Measured photographs and drawings
  • Removal or modification invoice
  • Prior approvals and storefront plans

Case-specific next step

For this property, the first paid review should reconcile the 4 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.