What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 3 Other Building / Code Compliance summonses. The hearing date is October 28, 2026; the source issue date(s) are August 20, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Other Building / Code Compliance — Summons 39558164M
CLASS - 1 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: 211.3.1.5.1 AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, THE ADJACENT PROPERTY AT EXPOSURE 4 HAD A CHIMNEY THAT WAS NOT EXTENDED AS REQUIRED, CREATING A HAZARD TO PUBLIC AND PROPERTY. STOP ALL W
Cited provision(s): 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 39558165Y
CLASS - 2 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXP# 2 REAR LACKED REQUIRED OVERHEAD PROTECTION OVER A PATIO WITH CHAIRS BELOW I'M GOING WORK, CREATING A HAZARD TO PUBLIC/PROPERTY. STOP ALL WORK AT
Cited provision(s): 2P3
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Other Building / Code Compliance — Summons 39558166X
CLASS - 1 · Issued August 20, 2026; hearing October 28, 2026. · Hearing status: PENDING
DOB allegation in the source extract: AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXPOSURE 4 ADJACENT PROPERTY LACKED REQUIRED ROOF PROTECTION, CREATING A HAZARD TO PUBLIC AND PROPERTY. STOP ALL WORK AT EXP. 4; MAINTAIN A 10-FT SET
Cited provision(s): 1P4
How this type of condition is typically resolved
The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.
Hearing issues to verify
- Does the summons identify the correct property, respondent, date and observed condition?
- Do agency records support or contradict the inspector's description?
- Was the condition corrected, permitted or otherwise resolved before the hearing?
Evidence that may matter
- Official DOB/OATH property and summons records
- Dated photographs and videos
- Permits, approved plans and inspection results
- Contracts, receipts, professional letters or witness statements tied to the cited condition
Case-specific next step
For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.