What DOB is alleging at this property
This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Demolition. The hearing date is October 14, 2026; the source issue date(s) are August 4, 2026.
Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.
Electrical Work / Electrical Permit — Summons 39198981X
CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED AT APT 3R, ELECTRICAL PANEL W/O REQUIRED COVERING, EXPOSING LIVE WIRES. CREATING POSSIBLE
Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
How this type of condition is typically resolved
Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.
Hearing issues to verify
- Was there an active electrical application/permit covering the cited wiring or equipment?
- Was the condition already corrected or disconnected before the inspection date?
- Does the cited equipment/location match the permitted scope and electrical inspection record?
Evidence that may matter
- Electrical permit/application and inspection records
- Licensed electrician invoice, letter or work order
- Photographs of wiring/equipment before and after correction
- Testing, certification or utility documentation where relevant
Demolition — Summons 39198982H
CLASS - 2 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING
DOB allegation in the source extract: FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED AT 3RD FL EXCESSIVE DUST ACCUMULATING ON FLOORS, HANDRAILS, STAIR RISERS. CREATING AN UNSAF
Cited provision(s): 2N7
How this type of condition is typically resolved
Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.
Hearing issues to verify
- Was a demolition permit or required notification in effect before work began?
- Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
- Do contractor and agency records show the required notice was timely?
Evidence that may matter
- Demolition permit and DOB NOW filing history
- Required notification confirmation / timestamp
- Asbestos/environmental documents
- Contractor logs, photographs and demolition sequence records
Case-specific next step
For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.
Submit These Summonses for Review