BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3004321

Brooklyn property record with 2 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Electrical Work / Electrical Permit

BoroughBrooklyn
BIN3004321
Block / Lot00338 / 0014
October Records2
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039198981X (source ECB number 39198981X). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39198981X
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $1,600.00 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED AT APT 3R, ELECTRICAL PANEL W/O REQUIRED COVERING, EXPOSING LIVE WIRES. CREATING POSSIBLE 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
39198982H
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED AT 3RD FL EXCESSIVE DUST ACCUMULATING ON FLOORS, HANDRAILS, STAIR RISERS. CREATING AN UNSAF 2N7

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 2 summons records for this property identifier. The charge mix is: Electrical Work / Electrical Permit; Demolition. The hearing date is October 14, 2026; the source issue date(s) are August 4, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Electrical Work / Electrical Permit — Summons 39198981X

CLASS - 1 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED AT APT 3R, ELECTRICAL PANEL W/O REQUIRED COVERING, EXPOSING LIVE WIRES. CREATING POSSIBLE

Cited provision(s): 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

How this type of condition is typically resolved

Electrical charges generally require determining whether the cited installation was permitted and performed under the required licensed-electrical process, then correcting unsafe or unapproved work and obtaining any required inspection/acceptance.

Hearing issues to verify

  • Was there an active electrical application/permit covering the cited wiring or equipment?
  • Was the condition already corrected or disconnected before the inspection date?
  • Does the cited equipment/location match the permitted scope and electrical inspection record?

Evidence that may matter

  • Electrical permit/application and inspection records
  • Licensed electrician invoice, letter or work order
  • Photographs of wiring/equipment before and after correction
  • Testing, certification or utility documentation where relevant

Demolition — Summons 39198982H

CLASS - 2 · Issued August 4, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: FAILURE TO PROVIDE PROTECTION FOR TENANTS DURING DEMOLITION OR CONSTRUCTION ACTIVITY IN AN OCCUPIED BUILDING. OBSERVED AT 3RD FL EXCESSIVE DUST ACCUMULATING ON FLOORS, HANDRAILS, STAIR RISERS. CREATING AN UNSAF

Cited provision(s): 2N7

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Case-specific next step

For this property, the first paid review should reconcile the 2 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.