Sidewalk Shed / Scaffold — Summons 39558087H
DOB allegation in the source extract: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED AT EXP 1 2 AND 3 OF A 12 STORY MIXED USE BUILDING WITH A MISSING PARAPET PANEL AS REQUIRED IN CODE 3301.9.2 WITH THE CONTENTS REQUIRED IN CODE 3301.9.2.1 CREATING UN
Cited provision(s): 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
How this type of condition is typically resolved
The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.
Hearing issues to verify
- Was the equipment covered by an active permit on the inspection date?
- Did the installed dimensions/protection match the approved design?
- Was a cited defect already corrected before the summons was issued or served?
Evidence that may matter
- DOB NOW equipment permit and approved drawings
- Engineer/contractor inspection logs
- Dated site photographs
- Renewal or removal records