BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 3006681

Brooklyn property record with 7 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 14, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Other Building / Code Compliance

BoroughBrooklyn
BIN3006681
Block / Lot00414 / 0054
October Records7
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039557640J (source ECB number 39557640J). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39557652R
ACTIVE
October 14, 2026
10:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE OVERHEAD PROTECTION FOR BOTH ADJOINING PROPERTIES @ EXP. 2&4 (3307.4.7)WORKING ZONES RELATED TO THE CONSTRUCTION OR DEMOLITION OF A BUILDING S 1P7
39557657X
ACTIVE
October 14, 2026
10:30 AM
CLASS - 2 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED BY STORING LARGE AMOUNT OF MATERIAL @ UNENCLOSED PREMETERS( 3303.4.7) STORAGE NEAR SIDEWALKS, WALKWAYS, AND PATHWAYS MUST BE PROVIDED WITH DOT PERMITS & 2P7
39557640J
ACTIVE
October 14, 2026
8:30 AM
CLASS - 1 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE WITHOUT CONSTRUCTION SUPERINTENDENT. THE OWNER FAILED TO PROVIDE CONSTRUCTION SUPERINTENDENT(3301.13.3)CS SHALL CARRY OUT ALL DUTIES AND RESPONSIBILITIES APPOIN 1P7
39557648Y
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $5,000.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM IT'S DUTIES (BC 3301.13.7 THROUGH BC 3301.13.13)UPON REQUEST CS WAS NOT PERSENT@TIME OF INSPECTION, NO DESIGNATED 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.
39557655M
ACTIVE
October 14, 2026
8:30 AM
CLASS - 2 PENDING $1,000.00 AT THE TIME OF MY INSPECTION OBSERVED SITE FAILED TO MAINTAIN CONSTRUCTION FENCE (BC 3307.7) @ EXP. 1 VIEWING PANEL COVERED & NO BLOCKAGE MATERIAL WAS PROVIDED(3307.7.3) VIEWING PANELS NON-FRANGIBLE ACRYLIC PAN 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
39557651P
ACTIVE
October 14, 2026
9:30 AM
CLASS - 1 PENDING $2,500.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE APPROVE DOCUMENTS ON SITE(BC 3301.7-2014 CODE) UNPON REQUEST SITE FAILED TO PROVIDE SITE SAFETY PLANS, STRUCTURAL STEEL PLANS,COLD FORM STEEL 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39557656Y
ACTIVE
October 14, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE PROPER HOUSEKEEPING FOR OVERLOADED DEBRIS THROUGHOUT THE SITE (BC 3303.4 & 27-1018) SITE FAILED BY NEGLECTING ITS RESPONSIBITIES BY INSURING T 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 7 summons records for this property identifier. The charge mix is: 4 Other Building / Code Compliance summonses; Demolition; Sidewalk Shed / Scaffold; Site Safety / Safeguarding. The hearing date is October 14, 2026; the source issue date(s) are August 6, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Demolition — Summons 39557652R

CLASS - 1 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE OVERHEAD PROTECTION FOR BOTH ADJOINING PROPERTIES @ EXP. 2&4 (3307.4.7)WORKING ZONES RELATED TO THE CONSTRUCTION OR DEMOLITION OF A BUILDING S

Cited provision(s): 1P7

How this type of condition is typically resolved

Demolition charges can involve missing permits, missing notifications, unsafe demolition practices or work outside approved scope. Resolution requires identifying the exact procedural/safety failure and completing the missing filing or corrective work.

Hearing issues to verify

  • Was a demolition permit or required notification in effect before work began?
  • Did the cited activity constitute demolition under the applicable filing, or another permitted scope?
  • Do contractor and agency records show the required notice was timely?

Evidence that may matter

  • Demolition permit and DOB NOW filing history
  • Required notification confirmation / timestamp
  • Asbestos/environmental documents
  • Contractor logs, photographs and demolition sequence records

Other Building / Code Compliance — Summons 39557657X

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED BY STORING LARGE AMOUNT OF MATERIAL @ UNENCLOSED PREMETERS( 3303.4.7) STORAGE NEAR SIDEWALKS, WALKWAYS, AND PATHWAYS MUST BE PROVIDED WITH DOT PERMITS &

Cited provision(s): 2P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557640J

CLASS - 1 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE WITHOUT CONSTRUCTION SUPERINTENDENT. THE OWNER FAILED TO PROVIDE CONSTRUCTION SUPERINTENDENT(3301.13.3)CS SHALL CARRY OUT ALL DUTIES AND RESPONSIBILITIES APPOIN

Cited provision(s): 1P7

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Other Building / Code Compliance — Summons 39557648Y

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM IT'S DUTIES (BC 3301.13.7 THROUGH BC 3301.13.13)UPON REQUEST CS WAS NOT PERSENT@TIME OF INSPECTION, NO DESIGNATED

Cited provision(s): 2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Sidewalk Shed / Scaffold — Summons 39557655M

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED SITE FAILED TO MAINTAIN CONSTRUCTION FENCE (BC 3307.7) @ EXP. 1 VIEWING PANEL COVERED & NO BLOCKAGE MATERIAL WAS PROVIDED(3307.7.3) VIEWING PANELS NON-FRANGIBLE ACRYLIC PAN

Cited provision(s): 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

How this type of condition is typically resolved

The issue is typically whether the shed/scaffold was permitted, properly installed and maintained, and whether the equipment matched the approved filing and current safety requirements. Correction can involve permit renewal, physical modification, inspection, or removal.

Hearing issues to verify

  • Was the equipment covered by an active permit on the inspection date?
  • Did the installed dimensions/protection match the approved design?
  • Was a cited defect already corrected before the summons was issued or served?

Evidence that may matter

  • DOB NOW equipment permit and approved drawings
  • Engineer/contractor inspection logs
  • Dated site photographs
  • Renewal or removal records

Site Safety / Safeguarding — Summons 39557651P

CLASS - 1 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE APPROVE DOCUMENTS ON SITE(BC 3301.7-2014 CODE) UNPON REQUEST SITE FAILED TO PROVIDE SITE SAFETY PLANS, STRUCTURAL STEEL PLANS,COLD FORM STEEL

Cited provision(s): 1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Other Building / Code Compliance — Summons 39557656Y

CLASS - 2 · Issued August 6, 2026; hearing October 14, 2026. · Hearing status: PENDING

DOB allegation in the source extract: AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE PROPER HOUSEKEEPING FOR OVERLOADED DEBRIS THROUGHOUT THE SITE (BC 3303.4 & 27-1018) SITE FAILED BY NEGLECTING ITS RESPONSIBITIES BY INSURING T

Cited provision(s): 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

How this type of condition is typically resolved

The first step is to read the inspector's narrative together with every cited code section and determine exactly what act, condition or missing filing DOB alleges. The correction and hearing strategy should then be built around that specific charge rather than a generic violation-removal checklist.

Hearing issues to verify

  • Does the summons identify the correct property, respondent, date and observed condition?
  • Do agency records support or contradict the inspector's description?
  • Was the condition corrected, permitted or otherwise resolved before the hearing?

Evidence that may matter

  • Official DOB/OATH property and summons records
  • Dated photographs and videos
  • Permits, approved plans and inspection results
  • Contracts, receipts, professional letters or witness statements tied to the cited condition

Case-specific next step

For this property, the first paid review should reconcile the 7 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.